With the passage of the Nuclear Waste Policy Act of 1982 (NWPA), Congress for the first time established in law a comprehensive Federal policy for commercial high-level radioactive waste management, including interim storage and permanent disposal. NWPA provides sufficient authority for
developing and operating a high-level radioactive waste management system based on disposal in mined geologic repositories. Authorization
Confidence in the long-term safety of deep geological disposal, and the ways in which this
confidence can be obtained and communicated, are topics of great importance to the radioactive waste
management community.1
The technical aspects of confidence have been the subject of considerable debate, especially
the concept of model validation. It has, for example, been pointed out that it is impossible to describe
fully the evolution of an open system, such as a repository and its environment, that cannot be
The Department of Energy (DOE), pursuant to the Atomic Energy Act of 1954
as amended, the Energy Reorganization Act of 1974, the Department of Energy
Organization Act of 1977, and the Nuclear Waste Policy Act of 1982 (the Act),
has the responsibility to provide for the disposal of high-level radioactive
waste and spent nuclear fuel.* The DOE selected mined geologic repositories
as the preferred means for the disposal of commercially generated high-level
radioactive waste and spent fuel (Federal Register, Vol. 46, p. 26677, May 14,
Japan’s spent fuel management and fuel cycle programs are now at a critical stage. Its first commercial-scale reprocessing plant, at Rokkasho Village, will soon start full-scale operation.
The Nuclear Waste Policy Act of 1982, as amended, established a statutory basis
for managing the nation’s civilian (or commercially produced) spent nuclear
fuel. The law established a process for siting, developing, licensing, and constructing
an underground repository for the permanent disposal of that waste.
Utilities were given the primary responsibility for storing spent fuel until it is
accepted by the Department of Energy (DOE) for disposal at a repository —
originally expected to begin operating in 1998. Since then, however, the repository
A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.
This report puts forth a number of options and recommendations for how to engage
stakeholders and other members of the public in the storage and management of spent
nuclear fuel and high level waste in the United States. The options are generated from a
scientific review of existing publications proposing criteria for assessing past efforts to
engage publics and stakeholders in decision-making about risky technologies. A set of
nine principles are derived for evaluating cases of public and stakeholder engagement with
The Russian Federation submits this report for review at the second meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management (the Convention).<br/>The purpose of the National Report is to inform on the compliance with the obligations undertaken by the Russian Federation in accordance with the Convention. The scope of application of the National Report is given in Section C.
A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.
The Federal Government will continue to meet Germany’s existing international obligations, par- ticularly with regard to fulfilment of the Joint Convention. In submitting this report, the Federal Re- public of Germany is demonstrating its compliance with the Joint Convention and ensuring the safe operation of facilities for the management of spent fuel and radioactive waste, including the de- commissioning of nuclear installations. At the same time, there is still a need for future action in order to maintain the required high standards of safety and ensure disposal.
The issue of interim storage of used (spent)1 fuel is dependent on a number of key factors, some
of which are not known at this time but are the subject of this study. The first is whether or not
the Yucca Mountain Project continues or is cancelled such that it may be able to receive spent
fuel from existing and decommissioned nuclear power stations. The second is whether the United
States will pursue a policy of reprocessing and recycling nuclear fuel. The reprocessing and
The responsibility for the governance of Australia is shared by the Australian government and the governments of the six states and two self governing territories. Responsibility for radiation health and safety in each State and Territory rests with the respective State/Territory government, unless the activity is carried out by an Australian government agency or a contractor to a Australian government agency; in those cases the activity is regulated by the Australian government.
In June 2008, the U.S. Department of Energy (DOE) submitted a license application to the U.S. Nuclear Regulatory Commission (NRC) for the construction of a geologic repository at Yucca Mountain, Nevada, for the disposal of spent nuclear fuel and high-level radioactive waste. The license application was accepted for formal NRC review in September 2008. Throughout the more than 20-year history of the Yucca Mountain project, EPRI has performed independent assessments of key technical and scientific issues to facilitate an understanding of overall repository performance.
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has left the U.S. program for management of used fuel and high level radioactive waste (HLW) in a state of uncertainty.
On 29 September 1997 the Join Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was open for signature at the headquarters of the International Atomic Energy Agency in Vienna. Brazil signed the Convention on October 11th, 1997 and ratified it by the Legislative Decree n. 1.019 of November 14th, 2005. Brazil deposited the instrument of ratification with the Depositary on 17 February 2006. The Convention objectives are to achieve and maintain a high level of nuclear safety worldwide in spent fuel and radioactive waste management.
The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was adopted on 29 September 1997 in the Vienna Diplomatic Conference. Estonia signed the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 05 January 2001. Estonian Parlament ratified the convention 19 October 2005. Estonia deposited the instrument of accession to the Joint Convention on 03 February 2006. The convention will entry into force 04 May 2006.
In Austria there is neither a nuclear power plant (NPP) nor any other fuel cycle facility in op- eration. One NPP was constructed in Zwentendorf in the 1970s, but, as a consequence of the negative vote in a referendum never put into operation. Two out of three research reactors in Austria have been shut down (ASTRA Seibersdorf in 2000, SIEMENS Argonaut Graz in 2004) and are currently under decommissioning. The remaining TRIGA research reactor in Vienna is still in operation. Spent nuclear fuel is stored on site in wet or dry storage facilities.
Questions and Answers to the National Report of the Czech Republic
Joint Convention Questions Posted to Denmark in 2006
The U.S. industry’s limited efforts at licensing transportation packages characterized as “highcapacity,”
or containing “high-burnup” (>45 GWd/MTU) commercial spent nuclear fuel
(CSNF), or both, have not been successful considering existing spent-fuel inventories that will
have to be eventually transported. A holistic framework is proposed for resolving several CSNF
transportation issues. The framework considers transportation risks, spent-fuel and cask-design
This report presents the results of a critical review of the technological challenges to the growth of nuclear energy, emerging advanced technologies that would have to be deployed, and fuel cycle strategies that could conceivably involve interim storage, plutonium recycling in thermal and fast reactors, reprocessed uranium recycling, and transmutation of minor actinide elements and fission products before eventual disposal of residual wastes.