Siting Experience Documents Only
Country
Keywords
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Hastholment.
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
During the 1990s, nuclear waste programmes in nearly every concerned country met many difficulties. Nuclear waste management was seen as a technical issue, and the local communities were only involved in the last stage of the decision-making process when almost all components of the decision were already fixed. The management of high level radioactive waste is now recognised as a complex decision-making process entailing technical, ethical, social, political and economic dimensions where no solution can be reached solely on the basis of technical considerations.
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
This report aims to clarify the dynamics of socio-technical challenges in the implementation of geological disposal (GD) for High Level Waste (HLW) and Spent Nuclear Fuel (SNF). Drawing on the 14 country reports produced within InSOTEC’s WP1 the synthesis focuses on socio-technical challenges that appear across national contexts. The synthesis report elucidates issues made visible through bringing together the analyses of different national contexts.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Answers to Questions Posted by the Contracting Parties on the Argentina First National Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Answers to Questions Posted by the Contracting Parties on the Argentina First National Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Answers to Questions Posted by the Contracting Parties on the Argentina First National Report
Expansion of the Repository for Spent Nuclear Fuel: Environmental Impact Assessment Report
Expansion of the Repository for Spent Nuclear Fuel: Environmental Impact Assessment Report
Safety Case Plan
Safety Case Plan
Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository.
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Olkiluoto Site Description
Olkiluoto Site Description
This second version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2004 (Posiva 2005) with the data and knowledge obtained up to December 2005.<br/>The main product of the modelling has been to develop a descriptive model of the site (the Site Descriptive Model), i.e. a model describing the geometry, properties of the bedrock and the water and the associated interacting processes and mechanisms.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Kivetty Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Kivetty Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Kivetty.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Olkiluoto.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Romuvaara Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Romuvaara Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Romuvaara.
Interim Summary Report of the Safety Case
Interim Summary Report of the Safety Case
The report outlines the current design and safety concept for the planned repository. It summarises the approach used to formulate scenarios for the evolution of the disposal system over time, describes these scenarios and presents the main models and computer codes used to analyse them. It also discusses compliance with Finnish regulatory requirements for long-term safety of a geological repository and gives the main evidence, arguments and analyses that lead to confidence, on the part of Posiva, in the long-term safety of the planned repository
Specific Design Principles for Deep Geological Repositories and Requirements for the Safety Case
Specific Design Principles for Deep Geological Repositories and Requirements for the Safety Case
The Swiss Federal Nuclear Safety Inspectorate (ENSI) is the regulatory authority for nuclear safety and security of the nuclear installations in Switzerland. ENSI issues guidelines either in its capacity as regulatory authority or based on a mandate in an ordinance. Guidelines are support documents that formalise the implementation of legal requirements and facilitate uniformity of implementation practices. They further concretise the state-of-the-art in science and technology.
Fourth Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Fourth Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia's obligation as a Contracting Party to this Convention.
Sectoral Plan for Deep Geological Repositories: Conceptual Part
Sectoral Plan for Deep Geological Repositories: Conceptual Part
The conceptual part of the sectoral plan for deep geological repositories defines the goals of the federal government in this area and the procedures and criteria to be applied in selecting sites for deep geological repositories for all categories of waste in Switzerland. The focus of the site selection process is on safetybased criteria, with land use and socio-economic aspects playing a secondary role.
First Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
First Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia’s obligation as a Contracting Party to this Convention.
This report was prepared by the Slovenian Nuclear Safety Administration. Contributions to the report were made by the Krško NPP, the Jožef Stefan Institute, the Agency for Radwaste Management, the Žirovski Vrh Uranium Mine and the Slovenian Radiation Protection Administration.
Activities of WENRA-WGWD
Activities of WENRA-WGWD
Summary of National and International Radioactive Waste Management Programs 1979
Summary of National and International Radioactive Waste Management Programs 1979
Many nations and international agencies are working to develop improved technology and industrial capability for nuclear fuel cycle and waste management operations. The effort in some countries is limited to research in university laboratories on treating low-level waste from reactor plant operations.
Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in ful- filment of Slovenia‘s obligation as a Contracting Party to this Convention.
Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia's obligation as a Contracting Party to this Convention.
Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties
Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties
Answers to questions raised by other contracting parties under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management were prepared by the Slovenian Nuclear Safety Administration, the Kr_ko NPP, the Agency for Radwaste Management and the Ministry of Infrastructure and Spatial Planning.
The Final Disposal Facility for Spent Nuclear Fuel
The Final Disposal Facility for Spent Nuclear Fuel
Thorough long-term studies have shown that the Finnish bedrock is suitable for the permanent isolation of spent nuclear fuel from organic nature. Legislation requires that besides safety, an assessment be made of any other environmental impacts of the final disposal facility. Environmental impact assessment (EIA) in respect of the final disposal facility for spent nuclear fuel got under way in 1997 when Posiva Oy, which is responsible for the project, began work on an EIA programme.
Posiva Annual Report
Posiva Annual Report
Main events Licensing process proceeds according to plan Posiva aims to submit the construction license application in 2012. In 2011, research and analysis work continued to ensure the timely availability of results and related reports. The feedback provided by the Radiation and Nuclear Safety Authority and other authorities for the preliminary licensing documentation submitted in 2009 was systematically reviewed in 2011, and steps were taken to ensure it is taken into account during the license submission phase.
Public Values and Stakeholder Involvement - A New Framework for Performance Assessment
Public Values and Stakeholder Involvement - A New Framework for Performance Assessment
The objective of the RISCOM II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model (Andersson et al., 1998) in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public.