Siting Experience Documents Only
Country
Keywords
WP 2 Appendix 10 Balance of Power: Principles and Good Practices for Local Stakeholders to Influence National Decision-making Processes
WP 2 Appendix 10 Balance of Power: Principles and Good Practices for Local Stakeholders to Influence National Decision-making Processes
Our basic position is that the outcomes of policy-making in radioactive waste management (RWM) should be driven by the will of the people through democratic processes. Achieving this inclusiveness requires good practices to increase local influence on what is essentially a national policy process. However inclusiveness poses significant practical problems; can society afford lengthy and costly consultation processes, often perceived as inefficient and ineffective?
WP 3 Quality of decision-making process Appendix: Synopsis of national decision-making processes
WP 3 Quality of decision-making process Appendix: Synopsis of national decision-making processes
WP 3 Quality of decision-making process Proposed Framework for Decision-making Processes
WP 3 Quality of decision-making process Proposed Framework for Decision-making Processes
The long-term governance of radioactive waste is complex socio-technical issue. The disposition of radioactive waste is decided on ethical grounds, having to take into account a variety of other dimensions (society, economy, ecology, politics, time, space, and technology). Thereto, a study of variants is required. Decision theory, in principle, takes diverse options as a starting point begin as the basis of a decision.
WP 2 Appendix 9 Principles and Good Practices for Local Actors to Influence National Decision-Making Processes
WP 2 Appendix 9 Principles and Good Practices for Local Actors to Influence National Decision-Making Processes
The outcomes of policy-making in radioactive waste management (RWM) should be driven by the will of the people through democratic processes. Achieving this inclusiveness requires good practices to increase local influence on what is essentially a national policy process. However inclusiveness poses significant practical problems; can society afford lengthy and costly consultation processes, often perceived as inefficient and ineffective?
Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
On 8 December 1997 Belgium has signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention via the Law of 2 August 2002. The ratification was obtained on 5 September 2002. The Convention became effective on 4 December 2002, or 90 days after the Ratification Act had been deposited. Belgium belongs to the group of Contracting Parties having at least one operational nuclear generating unit on their territory.
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
On 8 December 1997 Belgium signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention by the Law of 2 August 2002. The ratification followed on 5 September 2002. The Convention became effective on 4 December 2002, i.e. 90 days following ratification. Belgium belongs to the group of Contracting Parties having at least one operational nuclear power plant on their territory.
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
This document is the technical overview of the SAFIR 2 report that synthesises all of the technical and scientific knowledge available at the end of the second phase (1990–2000) of the ONDRAF/NIRAS programme of methodological research and development on the final disposal of category B and C waste in a poorly-indurated clay formation. The SAFIR 2 report will be handed over by ONDRAF/NIRAS to its supervisory Minister at the beginning of 2002, after publication approval by its Board of Directors.
Identifying remaining socio-technical challenges at the national level: Belgium
Identifying remaining socio-technical challenges at the national level: Belgium
This report is part of the research project International Socio-Technical Challenges for Implementing Geological Disposal: InSOTEC (see www.insotec.eu), funded by the European Commission under the Seventh Framework Programme.<br/>This report is a contribution to Work Package 1 of the project, which aims to identify the most significant socio-technical challenges related to geological disposal of radioactive waste. To achieve this objective, a comparative analysis of 14 national programmes will be performed.