Siting Experience Documents Only
Country
Keywords
Treatment and final disposal of nuclear waste: Programme for encapsulation, deep geological disposal, and research, development and demonstration: Ch 6 - App 1
Treatment and final disposal of nuclear waste: Programme for encapsulation, deep geological disposal, and research, development and demonstration: Ch 6 - App 1
In RD&D-Programme 92, SKB presented a partially new strategy for its activities. The new strategy entailed a focusing and concentration on the implementation of deep disposal of a limited quantity (about 800 tonnes) of encapsulated spent nuclear fuel during the coming 20-year period. Following this initial deposition, the results of the work will be evaluated, and only then will a decision be taken as to how and when regular deposition of the main body of the fuel and other long-lived nuclear waste will take place.
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
The development of radioactive waste repositories involves consideration of how the waste and the
engineered barrier systems will evolve, as well as the interactions between these and, often relatively
complex, natural systems. The timescales that must be considered are much longer than the timescales
that can be studied in the laboratory or during site characterisation. These and other factors can lead to
various types of uncertainty (on scenarios, models and parameters) in the assessment of long-term,
Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
On 8 December 1997 Belgium has signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention via the Law of 2 August 2002. The ratification was obtained on 5 September 2002. The Convention became effective on 4 December 2002, or 90 days after the Ratification Act had been deposited. Belgium belongs to the group of Contracting Parties having at least one operational nuclear generating unit on their territory.
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
News item from NEI summarizing siting process for nuclear waste repositories in Sweden, Finland and France.
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
On 8 December 1997 Belgium signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention by the Law of 2 August 2002. The ratification followed on 5 September 2002. The Convention became effective on 4 December 2002, i.e. 90 days following ratification. Belgium belongs to the group of Contracting Parties having at least one operational nuclear power plant on their territory.
Handling and final disposal of nuclear waste: Siting of a deep repository
Handling and final disposal of nuclear waste: Siting of a deep repository
The siting of the facilities for the disposal of spent nuclear fuel and other long-lived<br/>nuclear waste is one of the central remaining tasks within the Swedish waste programme.<br/>Work relating to the siting of the repository is being conducted in stages and will<br/>continue for most of the 1990:ies. This report describes the background to, the goals<br/>for and structure of SKB 's activities relating to the siting of a deep geological<br/>repository.
Treatment and final disposal of nuclear waste Detailed R&D-Programme 1993–1998
Treatment and final disposal of nuclear waste Detailed R&D-Programme 1993–1998
The goal of radioactive waste management in Sweden is to dispose of all radioactive waste products generated at the Swedish nuclear power plants in a safe manner. Furthermore, all other radioactive waste that arises in Sweden shall be safely disposed of.<br/>The Act on Nuclear Activities requires that the owners of the Swedish nuclear power plants adopt the measures that are needed to achieve this goal. The owners of the Swedish nuclear power plants have commissioned the Swedish Nuclear Fuel and Waste Management Company (SKB) to implement the measures that are needed.<br/>
Expert Judgement in Performance Assessment
Expert Judgement in Performance Assessment
Proposals to site, construct and operate a radioactive waste disposal facility in Sweden will be supported by performance assessments (PAs). Such PAs will require a range of expert judgements to be made. As part of SKI’s preparation for reviewing SKB’s Pas and for conducting independent PAs, SKI has identified a need for further research on the treatment of expert judgement in PA.
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
This document is the technical overview of the SAFIR 2 report that synthesises all of the technical and scientific knowledge available at the end of the second phase (1990–2000) of the ONDRAF/NIRAS programme of methodological research and development on the final disposal of category B and C waste in a poorly-indurated clay formation. The SAFIR 2 report will be handed over by ONDRAF/NIRAS to its supervisory Minister at the beginning of 2002, after publication approval by its Board of Directors.
RD&D-Programme 98 Treatment and final disposal of nuclear waste Programme for research, development and demonstration of encapsulation and geological disposal
RD&D-Programme 98 Treatment and final disposal of nuclear waste Programme for research, development and demonstration of encapsulation and geological disposal
During the next few years, SKB will add the results of county studies and additional feasibility studies to the background data for siting of the deep repository. We plan to be able to choose at least two sites for site investigations in 2001. The investigations, which will include test drillings, should be able to be started in 2002. An important milestone will thereby be passed in the siting work.<br/><br/>The technology for deep disposal will be tested on full scale at our laboratories in Oskarshamn.
TREATMENT AND FINAL DISPOSAL OF NUCLEAR WASTE: SUPPLEMENT TO THE 1992 PROGRAMME IN RESPONSE TO THE GOVERNMENT DECISION OF DECEMBER 16, 1993
Treatment and final disposal of nuclear waste: Programme for encapsulation, deep geological disposal, and research, development and demonstration: Ch 1 - 5
Treatment and final disposal of nuclear waste: Programme for encapsulation, deep geological disposal, and research, development and demonstration: Ch 1 - 5
In RD&D-Programme 92, SKB presented a partially new strategy for its activities. The new strategy entailed a focusing and concentration on the implementation of deep disposal of a limited quantity (about 800 tonnes) of encapsulated spent nuclear fuel during the coming 20-year period. Following this initial deposition, the results of the work will be evaluated, and only then will a decision be taken as to how and when regular deposition of the main body of the fuel and other long-lived nuclear waste will take place.
Handling and final disposal of nuclear waste. September 1989
Handling and final disposal of nuclear waste. September 1989
For those parts of the waste system that have already been taken into operation - transportation and handling systems, central interim storage facility for spent nuclear fuel (CLAB) and final repository for reactor waste (SFR)- the research and development stage has already largely been passed. The programme presented here therefore pertains primarily to the treatment and final disposal of spent fuel and the decommissioning of nuclear power plants.
Handling and final disposal of nuclear waste. September 1986
Handling and final disposal of nuclear waste. September 1986
The Act on Nuclear Activities (SFS 1984:3) obligates the owners of the Swedish nuclear power plants to<br/>jointly prepare a comprehensive programme for the research and development work and other measures<br/>required for the safe management and disposal of the waste from nuclear power.<br/>For those parts of the waste system that have already been taken into operation or are under construction - transportation and handling systems, central interim storage facility for spent nuclear fuel (CLAB) and final repository for reactor waste (SFR) - the research and development st
Identifying remaining socio-technical challenges at the national level: Belgium
Identifying remaining socio-technical challenges at the national level: Belgium
This report is part of the research project International Socio-Technical Challenges for Implementing Geological Disposal: InSOTEC (see www.insotec.eu), funded by the European Commission under the Seventh Framework Programme.<br/>This report is a contribution to Work Package 1 of the project, which aims to identify the most significant socio-technical challenges related to geological disposal of radioactive waste. To achieve this objective, a comparative analysis of 14 national programmes will be performed.
Radioactive Waste Management Programmes in OECD/NEA Member Countries: Sweden
Radioactive Waste Management Programmes in OECD/NEA Member Countries: Sweden
Summary of radioactive waste and management programs in Sweden, including national nuclear energy context; sources, types, and quantities of waste; radioactive waste management policies and programs; research and development; decommissioning and dismantling policies and projects; transport; authorities and implementing organizations; financing; and public information.
A Site is Selected
A Site is Selected
Web page from SKB's website (Swedish Nuclear Fuel and Waste Management Company), announcing that it has selected Forsmark, in the municipality of Östhammar, as the site for the final repository for Sweden's spent nuclear fuel.