Siting Experience Documents Only
Country
Keywords
The Partnership Approach to Siting and Developing Radioactive Waste Management Facilities
The Partnership Approach to Siting and Developing Radioactive Waste Management Facilities
History shows that the search for sites for radioactive waste management facilities has been marred by conflicts and delays. Affected communities have often objected that their concerns and interests were not addressed. In response, institutions have progressively turned away from the traditional “decide, announce and defend” model, and are learning to “engage, interact and co-operate”. This shift has fostered the emergence of partnerships between the proponent of the facility and the potential host community, as shown in a recent NEA study.
Making the decision-making basis for nuclear waste management transparent Summary of a pre-study report
Making the decision-making basis for nuclear waste management transparent Summary of a pre-study report
From Information and Consultation to Citizen Influence and Power: 10-year Evolution in Public Involvement in Radioactive Waste Management
Stakeholder Dialogue: Experience and Analysis
Stakeholder Dialogue: Experience and Analysis
The report begins with a consideration of the factors which have led to a growth in the use of dialogue processes, a clarification of key concepts and a classification of dialogue processes. A description of recent and current activities in Europe and North America is followed by discussion of the relationship of processes and contexts. This then leads to an identification of the key aims and evaluation criteria which will be used in the design of dialogue processes to be conducted in subsequent phases of the project.
Recommendation Group 3
Recommendation Group 3
Possible Strategies for Geoscientific Classification for High-Level Waste Repository Site Selection
Possible Strategies for Geoscientific Classification for High-Level Waste Repository Site Selection
This work was performed to suggest possible strategies for geoscientific classifications in the siting process of a high-level repository. To develop a feasible method for geoscientific classifications, a number of factors of a philosophical character, related to the purpose of the classifications, need to be accounted for. Many different approaches can be visualized, and this report was not intended to present a complete classification methodology.
Recommendation Group 6
Recommendation Group 6
REFLECTIONS ON THE INFLUENCE OF THE LOCAL ACTORS ON THE NATIONAL NUCLEAR WASTE MANAGEMENT FRAMEWORK
Recommendation Group 4
Recommendation Group 4
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
The development of radioactive waste repositories involves consideration of how the waste and the
engineered barrier systems will evolve, as well as the interactions between these and, often relatively
complex, natural systems. The timescales that must be considered are much longer than the timescales
that can be studied in the laboratory or during site characterisation. These and other factors can lead to
various types of uncertainty (on scenarios, models and parameters) in the assessment of long-term,
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Sweden National Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Sweden National Report
Spent fuel in Sweden emanates mainly from four commercial nuclear power plants. In addition there is one material testing reactor and one research reactor. The radioactive waste originates from the nuclear power industry as well as medical use, industry, research and consumer products.
The National Report of the Russian Federation on Compliance with the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, prepared for the second Review Meeting
The National Report of the Russian Federation on Compliance with the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, prepared for the second Review Meeting
The Russian Federation submits this report for review at the second meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management (the Convention).<br/>The purpose of the National Report is to inform on the compliance with the obligations undertaken by the Russian Federation in accordance with the Convention. The scope of application of the National Report is given in Section C.
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
News item from NEI summarizing siting process for nuclear waste repositories in Sweden, Finland and France.
Norway Signs Deal on Nuclear Waste Disposal System in Northern Russia
Norway Signs Deal on Nuclear Waste Disposal System in Northern Russia
Russia and Norway have signed contracts worth 100 million rubles ($2.9 million) to develop a system to deal with radioactive waste at the Andreeva Bay storage facility near Murmansk, the Russian state nuclear corporation Rosatom said Tuesday.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, National Report from Estonia, Second Review Meeting
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, National Report from Estonia, Second Review Meeting
The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was adopted on 29 September 1997 in the Vienna Diplomatic Conference. Estonia signed the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 05 January 2001. Estonian Parlament ratified the convention 19 October 2005. Estonia deposited the instrument of accession to the Joint Convention on 03 February 2006. The convention will entry into force 04 May 2006.
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 3 Ch 18 -27
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 3 Ch 18 -27
The first world wide review of the geological problems in radioactive waste isolation was published by Lawrence Berkeley National Laboratory in 1991. This review was a compilation of reports that had been submitted to a workshop held in conjunction with the 28th International Geological Congress that took place July 9-19,1989 in Washington, D.C.
Performance Assessment, Participative Processes and Value Judgements: Report from the First RISCOM II Workshop
Performance Assessment, Participative Processes and Value Judgements: Report from the First RISCOM II Workshop
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
During the 1990s, nuclear waste programmes in nearly every concerned country met many difficulties. Nuclear waste management was seen as a technical issue, and the local communities were only involved in the last stage of the decision-making process when almost all components of the decision were already fixed. The management of high level radioactive waste is now recognised as a complex decision-making process entailing technical, ethical, social, political and economic dimensions where no solution can be reached solely on the basis of technical considerations.
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
This report aims to clarify the dynamics of socio-technical challenges in the implementation of geological disposal (GD) for High Level Waste (HLW) and Spent Nuclear Fuel (SNF). Drawing on the 14 country reports produced within InSOTEC’s WP1 the synthesis focuses on socio-technical challenges that appear across national contexts. The synthesis report elucidates issues made visible through bringing together the analyses of different national contexts.
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
These proposed guidelines are recommendations that have emerged from the European Union Research Project ARGONA (Arenas for Risk Governance), Contract no.: FP6-036413
RD&D Programme 2010: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2010: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2010 presents SKB’s plans for research, development and demonstration during<br/>the period 2011–2016. SKB’s activities are divided into two main areas: the programme for low- and<br/>intermediate-level waste (the LILW Programme) and the Nuclear Fuel Programme.
Sweden's Third National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Swedish Implementation of the Obligations of the Joint Convention
Sweden's Third National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Swedish Implementation of the Obligations of the Joint Convention
This report is issued according to Article 32 of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.<br/>Sweden signed the Joint Convention September 29, 1997, the first day it was open for signing, during the ongoing General Conference at IAEA.
Sweden's Second National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Sweden National Report
Sweden's Second National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Sweden National Report
Spent fuel in Sweden emanates mainly from four commercial nuclear power plants, one material testing<br/>reactor and one research reactor. The radioactive waste originates from the nuclear power industry as well<br/>as medical use, industry, research and consumer products.
Geosphere Performance Indices: Comparative measures for site selection and safety assesment of deep waste repositories
Geosphere Performance Indices: Comparative measures for site selection and safety assesment of deep waste repositories
The concept of Geosphere Perfonnance Indices (GPis) is proposed. The "performance"<br/>refers to the geosphere's capacity to retain/contain radionuclides in the event of their accidental<br/>release at some point in time. The GPis are based on the Lagrangian stochastic-analytical<br/>framework for transport in the subsurface and are believed to render useful tools in performance<br/>assessment studies in general and in the site selection process in particular.
RD&D Programme 2007: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2007: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2007 presents SKB’s plans for research, development and demonstration during<br/>the period 2008–2013. The plans for the first three-year period are for natural reasons more detailed<br/>than those for the next one.