Siting Experience Documents Only
Country
Keywords
Radioactive Waste Disposal in Geological Formations International Conference Braunschweig ("City of Science 2007") November 6 – 9, 2007 Proceedings
Radioactive Waste Disposal in Geological Formations International Conference Braunschweig ("City of Science 2007") November 6 – 9, 2007 Proceedings
To solve the still open question of high-level radioactive waste disposal, the countries having made the greatest progress in this
field usually choose to carry out comparing selection procedures including broad involvement of the public. This is a central
result of the “RepoSafe”symposium which took place from November 6 to 9, 2007, in Braunschweig. Within the scope of
this symposium, internationally leading experts, invited by the Federal Office for Radiation Protection (BfS) and Gesellschaft
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 2nd Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 2nd Finnish National Report as referred to in Article 32 of the Convention
Finland signed the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management on 2 October 1997 and deposited the tools of acceptance on 10 February 2000. The Convention entered into force on 18 June 2001. The major generators of radioactive waste in Finland are the two nuclear power plants, the Loviisa and Olkiluoto plants. The Loviisa plant has two PWR units, operated by Fortum Power and Heat Oy, and the Olkiluoto plant two BWR units, operated by Teollisuuden Voima Oy.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Third Review Meeting in May 2009
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Third Review Meeting in May 2009
The Federal Government will continue to meet Germany’s existing international obligations, particularly with regard to fulfilment of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. In submitting this report, Germany is demonstrating its compliance with the Joint Convention and how it ensures the safe operation of facilities for the management of spent fuel and radioactive waste, including the decommissioning of nu-clear installations.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 4th Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 4th Finnish National Report as referred to in Article 32 of the Convention
This is the Finnish National Report, in accordance with the provisions of the Article 32 of the Joint Convention, to the 4th Review Meeting of the Contracting Parties in May 2012. The aim of this report is to present the recent developments of waste management in Finland, to describe waste management facilities and practices in Finland and, for discussion and review among contracting parties, to describe how the obligations under the Convention are fulfilled in Finland.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 3rd Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 3rd Finnish National Report as referred to in Article 32 of the Convention
The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was adopted on 29 September 1997 in the Vienna Diplomatic Conference. Finland signed the Convention on 2 October 1997 and deposited the tools of acceptance on 10 February 2000. The Convention entered into force on 18 June 2001. The fulfillment of the obligations of the Convention and the developments after the second Review Meeting are assessed in this report.
Report on Implementation of the Obligations under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management–Second Review Meeting of the Contracting Parties
Report on Implementation of the Obligations under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management–Second Review Meeting of the Contracting Parties
The European Atomic Energy Community (“Euratom”) is a regional organisation, as referred to in Article 39(4) of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. It became a party to the Convention on 2 January 2006. This report is submitted in compliance with Articles 30 and 32 of the Convention for the Second Review Meeting of the Contracting Parties, to be held in Vienna from 15 to 26 May 2006.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report under the Joint Convention by the Government of the Federal Republic of Germany for the Second Review Meeting in May 2006
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report under the Joint Convention by the Government of the Federal Republic of Germany for the Second Review Meeting in May 2006
The Federal Government will continue to meet Germany’s existing international obligations, par- ticularly with regard to fulfilment of the Joint Convention. In submitting this report, the Federal Re- public of Germany is demonstrating its compliance with the Joint Convention and ensuring the safe operation of facilities for the management of spent fuel and radioactive waste, including the de- commissioning of nuclear installations. At the same time, there is still a need for future action in order to maintain the required high standards of safety and ensure disposal.
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
Other Countries Provide Lessons for US in Managing Used Nuclear Fuel
News item from NEI summarizing siting process for nuclear waste repositories in Sweden, Finland and France.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Fourth Review Meeting in May 2012
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Fourth Review Meeting in May 2012
There are currently nine power reactors in operation in Germany. These are exclusively light-water reactors (seven pressurised water reactors and two boiling water reactors whose fuel assemblies are composed of low-enriched uranium oxide or uranium/plutonium mixed oxide (MOX)).
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Questions and Comments in 2009 on the National Report posed to Germany
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Questions and Comments in 2009 on the National Report posed to Germany
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Questions and Comments in 2009 on the National Report posed to Germany
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Hastholment.
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Olkiluoto Site Description
Olkiluoto Site Description
This second version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2004 (Posiva 2005) with the data and knowledge obtained up to December 2005.<br/>The main product of the modelling has been to develop a descriptive model of the site (the Site Descriptive Model), i.e. a model describing the geometry, properties of the bedrock and the water and the associated interacting processes and mechanisms.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Kivetty Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Kivetty Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Kivetty.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Olkiluoto.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Romuvaara Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Romuvaara Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Romuvaara.
The Final Disposal Facility for Spent Nuclear Fuel
The Final Disposal Facility for Spent Nuclear Fuel
Thorough long-term studies have shown that the Finnish bedrock is suitable for the permanent isolation of spent nuclear fuel from organic nature. Legislation requires that besides safety, an assessment be made of any other environmental impacts of the final disposal facility. Environmental impact assessment (EIA) in respect of the final disposal facility for spent nuclear fuel got under way in 1997 when Posiva Oy, which is responsible for the project, began work on an EIA programme.
Posiva Annual Report
Posiva Annual Report
Main events Licensing process proceeds according to plan Posiva aims to submit the construction license application in 2012. In 2011, research and analysis work continued to ensure the timely availability of results and related reports. The feedback provided by the Radiation and Nuclear Safety Authority and other authorities for the preliminary licensing documentation submitted in 2009 was systematically reviewed in 2011, and steps were taken to ensure it is taken into account during the license submission phase.
Identifying remaining socio-technical challenges at the national level: Finland
Identifying remaining socio-technical challenges at the national level: Finland
This research report is part of the research programme International Socio-Technical Challenges for Implementing Geological Disposal (InSOTEC; see www.insotec.eu). The research programme is funded by the Seventh Framework Programme Theme [Fission-2010-1.1.2] [Research activities in support of implementation of geological disposal] (Grant agreement no: 269906).