Siting Experience Documents Only
Country
Keywords
Reflecting on the Implementing Geological Disposal Technology Platform as a knowledge network and potential scenarios for stakeholder involvement
Reflecting on the Implementing Geological Disposal Technology Platform as a knowledge network and potential scenarios for stakeholder involvement
This report was prepared in the context of Work Package 3 of the InSOTEC project. The overall objective of this work package (WP) is to take a closer look at arenas where socio-technical combinations on radioactive waste management (RWM) are formed. The attempt is to illustrate the interconnections between the sources of different types of information and knowledge development with the various stakeholders having access to that information.
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
This report aims to clarify the dynamics of socio-technical challenges in the implementation of geological disposal (GD) for High Level Waste (HLW) and Spent Nuclear Fuel (SNF). Drawing on the 14 country reports produced within InSOTEC’s WP1 the synthesis focuses on socio-technical challenges that appear across national contexts. The synthesis report elucidates issues made visible through bringing together the analyses of different national contexts.
Summary of National and International Radioactive Waste Management Programs 1979
Summary of National and International Radioactive Waste Management Programs 1979
Many nations and international agencies are working to develop improved technology and industrial capability for nuclear fuel cycle and waste management operations. The effort in some countries is limited to research in university laboratories on treating low-level waste from reactor plant operations.
Delay in Finnish Repository Licence Review
Delay in Finnish Repository Licence Review
The Finnish nuclear regulator needs another six months to review Posiva's application to build a waste encapsulation plant and a final repository at Olkiluoto.