Siting Experience Documents Only
Country
Keywords
Reflecting on the Implementing Geological Disposal Technology Platform as a knowledge network and potential scenarios for stakeholder involvement
Reflecting on the Implementing Geological Disposal Technology Platform as a knowledge network and potential scenarios for stakeholder involvement
This report was prepared in the context of Work Package 3 of the InSOTEC project. The overall objective of this work package (WP) is to take a closer look at arenas where socio-technical combinations on radioactive waste management (RWM) are formed. The attempt is to illustrate the interconnections between the sources of different types of information and knowledge development with the various stakeholders having access to that information.
Annual Report 2010 on Radiation and Nuclear Safety in the Republic of Slovenia
Annual Report 2010 on Radiation and Nuclear Safety in the Republic of Slovenia
In 2010, there were no events that posed a serious radiological threat to the population in Slovenia. There were also no particularities in relation to the services of radiation practices and operators of radiation facilities.
The Krško NPP operated without shutdowns and production was interrupted only for the annual outage. In 2010, the power plant produced 5.7 TWh in total and achieved 89.9% availability. The nuclear power plant had no major problems during the September floods, when the Sava river otherwise seriously threatened settlements in Posavje.
Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties
Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties
Answers to questions raised by other contracting parties under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management were prepared by the Slovenian Nuclear Safety Administration, the Kr_ko NPP, the Agency for Radwaste Management and the Ministry of Infrastructure and Spatial Planning.
Transparency and Public Participation in Radioactive Waste Management: RISCOM II Final report
Transparency and Public Participation in Radioactive Waste Management: RISCOM II Final report
Long-term radioactive waste management (RWM) involves large and long-term research and development programmes in essentially all countries with civil nuclear programmes. Such programmes develop through different phases from basic research to more focussed applied research and development (R&D) and finally to the design and siting of proposed solutions. Internationally basic principles for the conduct of these programmes, basic safety principles and guidance on how to comply with them have largely been agreed upon.
Identifying remaining socio-technical challenges at the national level: Slovenia
Identifying remaining socio-technical challenges at the national level: Slovenia
The use of nuclear energy has a strong tradition in Slovenia. In 1949 the Institute Josef Stefan was founded, devoted to research in physics, with great emphasis on nuclear physics. A few years later (1966) the research nuclear reactor TRIGA started to work in the vicinity of capital city Ljubljana, to support its research.
Identifying remaining socio-technical challenges at the national level: Finland
Identifying remaining socio-technical challenges at the national level: Finland
This research report is part of the research programme International Socio-Technical Challenges for Implementing Geological Disposal (InSOTEC; see www.insotec.eu). The research programme is funded by the Seventh Framework Programme Theme [Fission-2010-1.1.2] [Research activities in support of implementation of geological disposal] (Grant agreement no: 269906).
Radioactive Waste Management and Decommissioning in Japan
Radioactive Waste Management and Decommissioning in Japan
OECD/NEA: Norway
OECD/NEA: Norway
Radioactive Waste Management and Decommissioning in Finland
Radioactive Waste Management and Decommissioning in Finland
OECD/NEA: Finland
OECD/NEA: Finland
STUK to Review the Safety of Posiva's Final Disposal Facility
STUK to Review the Safety of Posiva's Final Disposal Facility
Press release by STUK stating that it will be reviewing Posiva Oy's license application for constructing a repository for disposal of spent nuclear fuel.
STUK Needs More Time to Assess the Safety of Posiva's Disposal Facility
STUK Needs More Time to Assess the Safety of Posiva's Disposal Facility
Press release from STUK stating that it needs six months longer than originally planned to review Posiva's license application for a construction permit for disposal of spent nuclear fuel.
Selecting the Site: The Final Disposal at Olkiluoto
Selecting the Site: The Final Disposal at Olkiluoto
Posiva webpage discussing selecting the site for final disposal of spent fuel.
Radioactive Waste Management Programmes in OECD/NEA Member Countries: Finland
Radioactive Waste Management Programmes in OECD/NEA Member Countries: Finland
A summary of the radioactive waste management programs in Finland, including the national nuclear energy context; sources, types, and quantities of waste; radioactive waste management policies and programs; research and development; decommissioning and dismantling policies and projects; transport; authorities and implementing organizations; financing; and public information.
The Finnish Nuclear Waste Management Programme: Experience, Status and Views on the Future
The Finnish Nuclear Waste Management Programme: Experience, Status and Views on the Future
Presentation by Posiva Oy at The Stockholm Talks on October 2, 2013 on the status of the Finnish nuclear waste management program.
Nuclear Waste Management in Finland
Nuclear Waste Management in Finland
A summary of nuclear waste management in Finland, including energy use statistics, principles of nuclear waste management, financing, how waste is disposed of, the underground research laboratory, and the authorities involved in nuclear waste management.
Delay in Finnish Repository Licence Review
Delay in Finnish Repository Licence Review
The Finnish nuclear regulator needs another six months to review Posiva's application to build a waste encapsulation plant and a final repository at Olkiluoto.
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 1 Ch 1 - 9
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 1 Ch 1 - 9
The first world wide review of the geological problems in radioactive waste isolation was published by Lawrence Berkeley National Laboratory in 1991. This review was a compilation of reports that had been submitted to a workshop held in conjunction with the 28th International Geological Congress that took place July 9-19,1989 in Washington, D.C.