European Union Contract Number: FP6-036413. Deliverable 23b. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Summary Report
European Union Contract Number: FP6-036413. Deliverable 23b. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Summary Report
The point of departure for the ARGONA project is that participation and transparency are key elements of effective risk governance and the acronym ARGONA stands for "Arenas for Risk Governance ". Given the overall objectives, ARGONA intended to demonstrate how participation and transparency link to the political and legal systems and how new approaches can be implemented in radioactive waste management programmes.
European Union Contract Number: FP6-036413. Deliverable 23a. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Report
European Union Contract Number: FP6-036413. Deliverable 23a. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Report
ARGONA is a project within the European Commission 6th framework programme. The overall objective was to support transparency of decision-making processes in the radioactive waste programmes of the participating countries, and also of the European Union, by means of a greater degree of public participation.
Geological Challenges in Radioactive Waste Isolation Third Worldwide Review
Geological Challenges in Radioactive Waste Isolation Third Worldwide Review
The first worldwide review of geological problems in radioactive waste isolation was published by the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) in 1991 (Witherspoon, 1991). This review was a compilation of reports that had been submitted to a workshop held in conjunction with the 28th International Geological Congress that took place July 9Ð19, 1989, in Washington, D.C.
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 3 Ch 18 -27
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 3 Ch 18 -27
The first world wide review of the geological problems in radioactive waste isolation was published by Lawrence Berkeley National Laboratory in 1991. This review was a compilation of reports that had been submitted to a workshop held in conjunction with the 28th International Geological Congress that took place July 9-19,1989 in Washington, D.C.
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
Socio-Technical Challenges to Implementing Geological Disposal: a Synthesis of Findings from 14 Countries
This report aims to clarify the dynamics of socio-technical challenges in the implementation of geological disposal (GD) for High Level Waste (HLW) and Spent Nuclear Fuel (SNF). Drawing on the 14 country reports produced within InSOTEC’s WP1 the synthesis focuses on socio-technical challenges that appear across national contexts. The synthesis report elucidates issues made visible through bringing together the analyses of different national contexts.
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
These proposed guidelines are recommendations that have emerged from the European Union Research Project ARGONA (Arenas for Risk Governance), Contract no.: FP6-036413
RD&D Programme 2007: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2007: Programme for research, development, and demonstration of methods for the management and disposal of nuclear waste
RD&D Programme 2007 presents SKB’s plans for research, development and demonstration during<br/>the period 2008–2013. The plans for the first three-year period are for natural reasons more detailed<br/>than those for the next one.
Site selection - Siting of the Final Repository for Spent Nuclear Fuel
Site selection - Siting of the Final Repository for Spent Nuclear Fuel
SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection<br/>is the end result of an extensive siting process that began in the early 1990s. The strategy and<br/>plan for the work was based on experience from investigations and development work over a period<br/>of more than ten years prior to then.<br/>This document describes the siting work and SKB’s choice of site for the final repository.
Selecting the Site: The Final Disposal at Olkiluoto
Selecting the Site: The Final Disposal at Olkiluoto
Posiva webpage discussing selecting the site for final disposal of spent fuel.
Nuclear Waste Management in Finland
Nuclear Waste Management in Finland
A summary of nuclear waste management in Finland, including energy use statistics, principles of nuclear waste management, financing, how waste is disposed of, the underground research laboratory, and the authorities involved in nuclear waste management.
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 1 Ch 1 - 9
Geological Problems in Radioactive Waste Isolation Second Worldwide Review Part 1 Ch 1 - 9
The first world wide review of the geological problems in radioactive waste isolation was published by Lawrence Berkeley National Laboratory in 1991. This review was a compilation of reports that had been submitted to a workshop held in conjunction with the 28th International Geological Congress that took place July 9-19,1989 in Washington, D.C.
Strong Local Support for Final Repository
Strong Local Support for Final Repository
Local support in favor of a final repository for spent nuclear in one's own municipality has increased somewhat in both Oskarshamn and Östhammar. This is shown by the annual public opinion poll that was conducted by Synovate on behalf of SKB.
Continuing Cooperation with Two Municipalities
Continuing Cooperation with Two Municipalities
Web page from SKB's website (Swedish Nuclear Fuel and Waste Management Company) discussing the ongoing cooperation between SKB and both Östhammar, where the repository is to be sited, and Oskarshamn, where the encapsulation plant is to be located.