Siting Experience Documents Only
Country
Keywords
D1-10 Prospective Case Study - Slovenia
D1-10 Prospective Case Study - Slovenia
Guidance on the Selection of PTA Tools: For Stakeholders involved in Radioactive Waste Governance WP1
Guidance on the Selection of PTA Tools: For Stakeholders involved in Radioactive Waste Governance WP1
This research on "e;Guidance on the selection of PTA tools for stakeholders involved in radioactive waste governance"e; was performed under the umbrella of COWAM2-'Work Package 1' (WP1). Through a dialogue on enhancing involvement at a local level, WP1 allows local stakeholders to examine the issues they face in building a democratic local governance process. WP1 also tests how Participatory Technology Assessment (PTA) methods can offer a consensual framework and a platform for deliberative co-decision among scientific and societal actors at the local level.
European-level Guidelines for the Inclusive Governance of Radioactive Waste Management
European-level Guidelines for the Inclusive Governance of Radioactive Waste Management
CIP (Community Waste Management In Practice) is a research action gathering a wide spectrum of stakeholders from five European countries, interested in how society should manage the radioactive wastes that result from nuclear power production and/or from medical, military or industrial applications.
Tools for Local Stakeholders in Radioactive Waste Governance: Challenges and Benefits of Selected PTA Techniques WP1
Tools for Local Stakeholders in Radioactive Waste Governance: Challenges and Benefits of Selected PTA Techniques WP1
The investigation consists of three parts and shall provide an input to the – empirical – PTA-2 study to be undertaken by SCK•CEN (called “lens”):<br>A. Compilation of – selected – existing PTA methods and procedures identifying requisites, practices, benefits, and challenges to answer the key questions in the context of WP1 about a PTA “toolbox”: “What can you apply, when can you apply, and what is needed to apply?” The multi-dimensional context of a possible “PTA situation” is analysed; suitable and nonsuitable methods, techniques and procedures are discussed.<br>B.
Recommendation Group 5
Recommendation Group 5
Final Report: Influence of Local Actors on National Decision-making Processes WP2
Final Report: Influence of Local Actors on National Decision-making Processes WP2
Work Package 2 (WP2) focused on the ways in which local stakeholders can influence national decision-making processes on radioactive waste management (RWM). The participants in WP2 were particularly interested in examining how local stakeholders could contribute to national debates. Their interest stemmed from the fact that participants from France, Spain and the United Kingdom — who made up the majority of the WP2 group — were engaged, as stakeholders, in the decision-making processes that were under way in each of those countries.
LEARNING AND ADAPTING TO SOCIETAL REQUIREMENTS
LEARNING AND ADAPTING TO SOCIETAL REQUIREMENTS
Reflections on Siting Approaches for Radioactive Waste Facilities: Synthesising Principles Based on International Learning
10-year Record of Learning Factual List of Activities and Investigated Topics, and of People Who Contributed to Them
The Partnership Approach to Siting and Developing Radioactive Waste Management Facilities
The Partnership Approach to Siting and Developing Radioactive Waste Management Facilities
History shows that the search for sites for radioactive waste management facilities has been marred by conflicts and delays. Affected communities have often objected that their concerns and interests were not addressed. In response, institutions have progressively turned away from the traditional “decide, announce and defend” model, and are learning to “engage, interact and co-operate”. This shift has fostered the emergence of partnerships between the proponent of the facility and the potential host community, as shown in a recent NEA study.
From Information and Consultation to Citizen Influence and Power: 10-year Evolution in Public Involvement in Radioactive Waste Management
Recommendation Group 3
Recommendation Group 3
Recommendation Group 4
Recommendation Group 4
Genesis of an Approach: From Public non-participation to Participation in a LILW Site Selection Process in Slovenia WP1
Genesis of an Approach: From Public non-participation to Participation in a LILW Site Selection Process in Slovenia WP1
Searching for the location of risky or unpleasant objects is becoming increasingly difficult task. Slovenia is for the number of years now in the process of search for the location of the low and intermediate waste (LILW) repository. Social acceptability of this facility is currently the main problem in this search. Efforts in this direction are presented in all its diversity, with weaknesses and successes, addressing also the context of the whole process, but especially considering different aspects of public participation.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 2nd Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 2nd Finnish National Report as referred to in Article 32 of the Convention
Finland signed the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management on 2 October 1997 and deposited the tools of acceptance on 10 February 2000. The Convention entered into force on 18 June 2001. The major generators of radioactive waste in Finland are the two nuclear power plants, the Loviisa and Olkiluoto plants. The Loviisa plant has two PWR units, operated by Fortum Power and Heat Oy, and the Olkiluoto plant two BWR units, operated by Teollisuuden Voima Oy.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 4th Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 4th Finnish National Report as referred to in Article 32 of the Convention
This is the Finnish National Report, in accordance with the provisions of the Article 32 of the Joint Convention, to the 4th Review Meeting of the Contracting Parties in May 2012. The aim of this report is to present the recent developments of waste management in Finland, to describe waste management facilities and practices in Finland and, for discussion and review among contracting parties, to describe how the obligations under the Convention are fulfilled in Finland.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 3rd Finnish National Report as referred to in Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 3rd Finnish National Report as referred to in Article 32 of the Convention
The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was adopted on 29 September 1997 in the Vienna Diplomatic Conference. Finland signed the Convention on 2 October 1997 and deposited the tools of acceptance on 10 February 2000. The Convention entered into force on 18 June 2001. The fulfillment of the obligations of the Convention and the developments after the second Review Meeting are assessed in this report.
Performance Assessment, Participative Processes and Value Judgements: Report from the First RISCOM II Workshop
Performance Assessment, Participative Processes and Value Judgements: Report from the First RISCOM II Workshop
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Hastholmen Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Hastholment.
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
Nuclear waste management from a local perspective: Reflections for a Better Governance Final Report
During the 1990s, nuclear waste programmes in nearly every concerned country met many difficulties. Nuclear waste management was seen as a technical issue, and the local communities were only involved in the last stage of the decision-making process when almost all components of the decision were already fixed. The management of high level radioactive waste is now recognised as a complex decision-making process entailing technical, ethical, social, political and economic dimensions where no solution can be reached solely on the basis of technical considerations.
Expansion of the Repository for Spent Nuclear Fuel: Environmental Impact Assessment Report
Expansion of the Repository for Spent Nuclear Fuel: Environmental Impact Assessment Report
Safety Case Plan
Safety Case Plan
Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository.
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Olkiluoto Site Description
Olkiluoto Site Description
This second version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2004 (Posiva 2005) with the data and knowledge obtained up to December 2005.<br/>The main product of the modelling has been to develop a descriptive model of the site (the Site Descriptive Model), i.e. a model describing the geometry, properties of the bedrock and the water and the associated interacting processes and mechanisms.