Skip to main content

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel (2024)

This report fulfills the M3 milestone M3SF-23PN0203020614, “Updated NPP Site Evaluation Report (2).” This report is an update of the 2021 report Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel and includes expansion of the site evaluations to include operating nuclear power plant (NPP) sites and to incorporate updated site inventory data. Figures that include the number of spent nuclear fuel (SNF) assemblies and metric tons heavy metal (MTHM) in a single figure have also been added to the report.

Initial Site-Specific De-Inventory Reports

 

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.