Skip to main content

Posiva Annual Report

Main events Licensing process proceeds according to plan Posiva aims to submit the construction license application in 2012. In 2011, research and analysis work continued to ensure the timely availability of results and related reports. The feedback provided by the Radiation and Nuclear Safety Authority and other authorities for the preliminary licensing documentation submitted in 2009 was systematically reviewed in 2011, and steps were taken to ensure it is taken into account during the license submission phase.

Nuclear Waste Facility Siting and Local Opposition

On the historic evidence, but also for the distinctive qualities of the challenge, nuclear waste siting conflicts are assuredly among the most refractory in the large variety of NIMBY (Not In My Back Yard) facility siting disputes. Since the president brought the Yucca Mountain process to a halt in 2010 (or, more accurately, issued its death certificate), the search for a permanent waste fuel repository is at the starting line again.

Making Nuclear Waste Governable: Deep Underground Disposal and the Challenge of Reversibility

This book is the result of a collaboration that began over two years ago between researchers from the social sciences and Andra engineers and natural scientists. Contributions to the various chapters have been discussed and enhanced, especially during the workshop and the interdisciplinary conference both held by Andra in 2008 and 2009<br>respectively.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.