Nuclear Waste Bill to Implement the Blue Ribbon Commission's Recommendations Section-by-Section Summary of Discussion Draft - April 2013

In General: The Nuclear Waste Administration Act of 2013 includes most of the language of S.3469, the Nuclear Waste Administration Act of 2012. The most significant change in the 2013 bill is the provision linking construction and siting of a consolidated storage facility to progress on a repository. The 2012 Act prohibited storage of any spent nuclear fuel beyond 10,000 metric tons until the Administration concluded a repository consent agreement.

Nuclear Waste Bill Feedback

On April 25, 2013, Senators Wyden, Alexander, Feinstein, and Murkowski released a draft bill to create a sustainable, participatory process for managing nuclear waste. The senators requested comments and suggestions on the draft bill, as well as on the alternative language for siting an interim storage facility proposed by Senators Alexander and Feinstein. In addition, the senators posed eight questions on which they sought comments.

Computational Benchmark for Estimation of Reactivity Margin from Fission Products and Minor Actinides in PWR Burnup Credit

This report proposes and documents a computational benchmark problem for the estimation of the additional reactivity margin available in spent nuclear fuel (SNF) from fission products and minor actinides in a burnupcredit storage/transport environment, relative to SNF compositions containing only the major actinides. The benchmark problemlconfiguration is a generic burnup credit cask designed to hold 32 pressurized water reactor (PWR) assemblies.

Commercial Spent Nuclear Fuel Waste Package Misload Analysis

The purpose of this calculation is to estimate the probability of misloading a commercial spent
nuclear fuel waste package with a fuel assembly(s) that has a reactivity (i.e., enrichment and/or
burnup) outside the waste package design. The waste package designs are based on the expected
commercial spent nuclear fuel assemblies and previous analyses (Macheret, P. 2001, Section 4.1
and Table 1). For this calculation, a misloaded waste package is defined as a waste package that

Waste Acceptance System Requirements Document, Revision 5, ICN 01

The purpose of this document is to establish waste acceptance technical requirements for the U.S. Department of Energy’s (DOE) Civilian Radioactive Waste Management System (CRWMS). These requirements and functions consist of two types: (a) internal CRWMS requirements derived from the Civilian Radioactive Waste Management System Requirements Document (CRD) (DOE 2007a) as illustrated in Figure 1, and (b) acceptance criteria imposed by the CRWMS on spent nuclear fuel (SNF) and high-level waste (HLW) delivered into the CRWMS.

One Step at a Time: The Staged Development of Geologic Repositories for High-Level Radioactive Waste - Summary

A new report from the National Academies proposes a management approach called “adaptive staging” as a promising means to develop geologic repositories for high-level waste such as the proposed repository at Yucca Mountain, Nevada. Adaptive staging is a learn-as-you-go process that enables project managers to continuously reevaluate and adjust the program in response to new knowledge and stakeholder input.

Radioactive Waste Repository Licensing, Synopsis of a Symposium, Executive Summary

This book recounts the issues raised and the viewpoints aired at a recent symposium on
repository licensing. It summarizes the problems surrounding the setting of an
Environmental Protection Agency standard for the release of radionuclides and the
regulatory problems inherent in meeting such a standard. Symposium participants came
from a variety of federal agencies and advisory groups, state governments, public interest
groups, engineering firms, national laboratories, and foreign and international
organizations.

Disposal and Storage of Spent Nuclear Fuel — Finding the Right Balance

The Nuclear Waste Policy Act of 1982, as amended, established a statutory basis
for managing the nation’s civilian (or commercially produced) spent nuclear
fuel. The law established a process for siting, developing, licensing, and constructing
an underground repository for the permanent disposal of that waste.
Utilities were given the primary responsibility for storing spent fuel until it is
accepted by the Department of Energy (DOE) for disposal at a repository —
originally expected to begin operating in 1998. Since then, however, the repository