Publication Date
Attach Document
Attachment | Size |
---|---|
DOE-WIPP_91_029_1993.pdf (5.68 MB) | 5.68 MB |
Abstract/Summary
In 1986, the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project<br/>Office (WPO) (DOE-WPO) prepared a strategy _ for complying with the Environmental<br/>Protection Agency's (EPA's) Standards for the management of transuranic (TRU) waste. 2<br/>Section 3.2.2.2 of the DOE's report addressed compliance with the Assurance<br/>Requirements found in 40 CFR ยง 191.143 . One of the Assurance Requirements addresses<br/>the selection of repository sites that contain recoverable natural resources.