Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Country
Keywords
Disposal Subcommittee Report to the Full Commission DRAFT
Disposal Subcommittee Report to the Full Commission DRAFT
The Disposal Subcommittee of the Blue Ribbon Commission on America’s Nuclear Future has
commenced to address a set of issues, all of which bear directly on the central question: “How can the
United States go about establishing one or more disposal sites for high-level nuclear wastes in a manner
and within a timeframe that is technically, socially, economically, and politically acceptable?”
To answer this question and to develop specific recommendations and options for consideration by the
Radiation Effects of Isotopic Uncertainty for Burnup Credit Validation
Radiation Effects of Isotopic Uncertainty for Burnup Credit Validation
The objective of this calculation is to provide the uncertainty term for fission product and minor actinides which contributes to the determination of the critical limit for burnup credit calculations. The scope of this calculation covers PWR and BWR spent nuclear fuel. This activity supports the Criticality Department's validation of burnup credit. The intended use of these results is in future Criticality Department calculations and analyses.
Analysis of Experimental Data for High Burnup PWR Spent Fuel Isotopic Validation--Calvert Cliffs, Takahama, and Three Mile Island Reactors
Analysis of Experimental Data for High Burnup PWR Spent Fuel Isotopic Validation--Calvert Cliffs, Takahama, and Three Mile Island Reactors
This report is part of a report series designed to document benchmark-quality radiochemical isotopic
assay data against which computer code accuracy can be quantified to establish the uncertainty and bias
associated with the code predictions. The experimental data included in the report series were acquired
from domestic and international programs and include spent fuel samples that cover a large burnup range.
The measurements analyzed in the current report, for which experimental data is publicly available,
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
The purpose of this document is to provide waste quantity and sequencing information that serves as the design basis for commercial spent nuclear fuel (CSNF) arriving at the repository, and the information on the transportation systems that will be used to deliver this fuel. It is intended as input for waste package and repository design analyses needed to ensure that facilities are flexible enough to be capable of receiving, unloading, handling, and emplacing the amounts and types of CSNF expected for receipt under realistic bounding conditions.
Long-term Safety for KBS-3 Repositories at Forsmark and Laxemar—a First Evaluation: Main Report of the SR-Can project
Long-term Safety for KBS-3 Repositories at Forsmark and Laxemar—a First Evaluation: Main Report of the SR-Can project
This document is the main report from the safety assessment project SR-Can. The SR-Can project is a preparatory stage for the SR-Site assessment, the report that will be used in support of SKB’s application for a final repository. The purposes of the safety assessment SR-Can are the following:
1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant.
Criticality Analysis of Assembly Misload in a PWR Burnup Credit Cask
Criticality Analysis of Assembly Misload in a PWR Burnup Credit Cask
The Interim Staff Guidance on burnup credit (ISG-8) for spent fuel in storage and transportation casks, issued by the Nuclear Regulatory Commission’s Spent Fuel Project Office, recommends a burnup measurement for each assembly to confirm the reactor record and compliance with the assembly burnup value used for loading acceptance. This recommendation is intended to prevent unauthorized loading (misloading) of assemblies due to inaccuracies in reactor burnup records and/or improper assembly identification, thereby ensuring that the appropriate subcritical margin is maintained.