Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Country
Keywords
Overview of Radioactive Waste Management for Presentation at the 17th Annual ASME Symposium on Nuclear Waste
Overview of Radioactive Waste Management for Presentation at the 17th Annual ASME Symposium on Nuclear Waste
Site Selection Procedure for Repository Sites, Recommendations of the AkEnd - Committee on a Site Selection Procedure for Repository Sites
Site Selection Procedure for Repository Sites, Recommendations of the AkEnd - Committee on a Site Selection Procedure for Repository Sites
With the establishment of the “Arbeitskreis Auswahlverfahren Endlagerstandorte” (AkEnd) – the Committee on a Site Selection Procedure for Repository Sites, in the following referred as to as the “committee” - the Federal Minister for the Environment set up a discussion forum on radioactive waste disposal, which has been called for by the public for quite some time.
Activity and Sustainable Development Report - 2010
Activity and Sustainable Development Report - 2010
Annual report produced by ANDRA, the French National Radioactive Waste Management Agency describing its activities in 2010.
More than Just Concrete Realities: The Symbolic Dimension of Radioactive Waste and its Management
More than Just Concrete Realities: The Symbolic Dimension of Radioactive Waste and its Management
A discussion of the symbolism of radioactive waste.
Regional Geological Assessment of the Devonian-Mississippian Shale Sequence of the Appalachian, Illinois, and Michigan Basins relative to Potential Storage/Disposal of Radioactive Wastes
Regional Geological Assessment of the Devonian-Mississippian Shale Sequence of the Appalachian, Illinois, and Michigan Basins relative to Potential Storage/Disposal of Radioactive Wastes
The thick and regionally extensive sequence of shales and associated clastic sedimentary rocks of Late Devonian and Early Mississippian age has been considered among the “nonsalt geologies” for deep subsurface containment of high-level radioactive wastes.
The Monitored Retrievable Storage Facility: Scoping the Environmental Assessment Process
The Monitored Retrievable Storage Facility: Scoping the Environmental Assessment Process
Reaching negotiated agreement with a state or Indian tribe and preparing of 1he environmental assessment (EA) required by Section 404 of the Nuclear Waste Policy Act, as amended (NWPAA), are the first steps in a process intended to result in the acceptance of radioactive waste at a monitored retrievable storage (MRS) facility starting in 1998. This paper examines requirements for the EA, the first environmental document to be prepared for siting an MRS facility, and discusses the process used to develop that document.
The Final Disposal Facility for Spent Nuclear Fuel
The Final Disposal Facility for Spent Nuclear Fuel
Thorough long-term studies have shown that the Finnish bedrock is suitable for the permanent isolation of spent nuclear fuel from organic nature. Legislation requires that besides safety, an assessment be made of any other environmental impacts of the final disposal facility. Environmental impact assessment (EIA) in respect of the final disposal facility for spent nuclear fuel got under way in 1997 when Posiva Oy, which is responsible for the project, began work on an EIA programme.
TECHNICAL STATUS OF THE RADIOACTIVE WASTE REPOSITORY - A DEMONSTRATION PROJECT FOR SOLID RADIOACTIVE WASTE DISPOSAL
TECHNICAL STATUS OF THE RADIOACTIVE WASTE REPOSITORY - A DEMONSTRATION PROJECT FOR SOLID RADIOACTIVE WASTE DISPOSAL
This report reviews the work that has been done to establish the suitability of bedded salt formations for the containment of radioactive solid wastes and describes the nature of the additional investigations that are either under way or are scheduled to be carried out. It is believed that this work constitutes a valid technical justification for proceeding with the present plans to establish a demonstration repository at Lyons, Kansas.
Posiva Annual Report
Posiva Annual Report
Main events Licensing process proceeds according to plan Posiva aims to submit the construction license application in 2012. In 2011, research and analysis work continued to ensure the timely availability of results and related reports. The feedback provided by the Radiation and Nuclear Safety Authority and other authorities for the preliminary licensing documentation submitted in 2009 was systematically reviewed in 2011, and steps were taken to ensure it is taken into account during the license submission phase.