Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
Second Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Kingdom of Belgium National Report
On 8 December 1997 Belgium has signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention via the Law of 2 August 2002. The ratification was obtained on 5 September 2002. The Convention became effective on 4 December 2002, or 90 days after the Ratification Act had been deposited. Belgium belongs to the group of Contracting Parties having at least one operational nuclear generating unit on their territory.
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium, Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting (May 2006), Answers to the Questions of Contracting Parties on the National Report submitted by Belgium
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report
On 8 December 1997 Belgium signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention by the Law of 2 August 2002. The ratification followed on 5 September 2002. The Convention became effective on 4 December 2002, i.e. 90 days following ratification. Belgium belongs to the group of Contracting Parties having at least one operational nuclear power plant on their territory.
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Final Disposal of Spent Nuclear Fuel in Finnish Bedrock - Olkiluoto Site Report
Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Hastholmen in Loviisa, Kivetty in Aanekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Olkiluoto.
Interim Summary Report of the Safety Case
Interim Summary Report of the Safety Case
The report outlines the current design and safety concept for the planned repository. It summarises the approach used to formulate scenarios for the evolution of the disposal system over time, describes these scenarios and presents the main models and computer codes used to analyse them. It also discusses compliance with Finnish regulatory requirements for long-term safety of a geological repository and gives the main evidence, arguments and analyses that lead to confidence, on the part of Posiva, in the long-term safety of the planned repository
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Final Disposal of Spent Nuclear Fuel in Olkiluoto
Olkiluoto Site Description
Olkiluoto Site Description
This second version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2004 (Posiva 2005) with the data and knowledge obtained up to December 2005.<br/>The main product of the modelling has been to develop a descriptive model of the site (the Site Descriptive Model), i.e. a model describing the geometry, properties of the bedrock and the water and the associated interacting processes and mechanisms.
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
Technical overview of the SAFIR 2 report: Safety Assessment and Feasibility Interim Report 2
This document is the technical overview of the SAFIR 2 report that synthesises all of the technical and scientific knowledge available at the end of the second phase (1990–2000) of the ONDRAF/NIRAS programme of methodological research and development on the final disposal of category B and C waste in a poorly-indurated clay formation. The SAFIR 2 report will be handed over by ONDRAF/NIRAS to its supervisory Minister at the beginning of 2002, after publication approval by its Board of Directors.
Identifying remaining socio-technical challenges at the national level: Belgium
Identifying remaining socio-technical challenges at the national level: Belgium
This report is part of the research project International Socio-Technical Challenges for Implementing Geological Disposal: InSOTEC (see www.insotec.eu), funded by the European Commission under the Seventh Framework Programme.<br/>This report is a contribution to Work Package 1 of the project, which aims to identify the most significant socio-technical challenges related to geological disposal of radioactive waste. To achieve this objective, a comparative analysis of 14 national programmes will be performed.