slides - Generic Issue Management--An Idea Taking Flight
slides - Generic Issue Management--An Idea Taking Flight
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
In July 1999, the U.S. Nuclear Regulatory Commission (NRC) Spent Fuel Project Office
(SFPO) issued Interim Staff Guidance 8 Revision 1 (ISG8R1) to provide recommendations for the use
of burnup credit in storage and transport of pressurized-water reactor (PWR) spent fuel. Subsequent to
the issuance of ISG8R1, the NRC Office of Regulatory Research (RES) has directed an effort to
investigate the technical basis for extending the criteria and recommendations of ISG8R1 to allow
In the course of producing electrical power in light water.reactors (LWRs), the uranium
fuel accumulates fission products until the fission process is no longer efficient for power
production. At that point the fuel is removed from the reactor and stored in water basins
to allow radioactivity to partially decay before further disposition. This fuel is referred
to as "spent fuel." Although spent fuel as At is discharged from a reactor is intensely
radioactive, it has been stored safely in moderate quantities for decades. Spent fuel could
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
The Interim Staff Guidance on burnup credit for pressurized water reactor (PWR) spent nuclear fuel (SNF), issued by the United States Nuclear Regulatory Commission's (U.S. NRC) Spent Fuel Project Office, recommends the use of analyses that provide an "adequate representation of the physics" and notes particular concern with the "need to consider the more reactive actinide compositions of fuels burned with fixed absorbers or with control rods fully or partly inserted." In the absence of readily available information on the extent of control rod (CR) usage in U.S.
NRC initiated a research activity with the Center for Nuclear Waste Regulatory Analyses (CNWRA®) to develop a conceptual test plan for measuring the quantity of residual water remaining in a canister following vacuum drying to the criterion referenced in NUREG–1536. While residual water may be considered as unbound or bound (i.e., physi- or chemisorbed), the focus of this test plan is only the unbound water. This activity consists of the preparation of two technical letter reports. The first is the present report, which describes current industry drying practices and capabilities.
The success of the Civilian Radioactive Waste Management Program of the U.S.
Department of Energy (DOE) is critical to U.S. ability to manage and dispose of
nuclear waste safely--and to the reestablishment of confidence in the nuclear energy
option in the United States. The program must conform with all applicable standards
and, in fact, set the example for a national policy on the safe disposal of radioactive
waste.
The Secretary of Energy has recently completed an extensive review of the
The U.S. Nuclear Regulatory Commission (NRC) is evaluating the safety and security of spent nuclear fuel (SNF) stored in dry casks for extended time periods before transportation to a location where the SNF is further processed or permanently disposed.
By the end of this century, the United States plans to begin operating the first geologic repository for the permanent disposal of commercial spent nuclear fuel and high-level radioactive Waste. Public Law 97-425, the Nuclear waste Policy Act of 1982 (the Act), specifies the process for selecting a repository site, and constructing, operating, closing, and decommissioning the repository.
Goal: Secure the Benefits, Limit the Risk
The extent to which nuclear power will be a broadly accepted option for meeting future global energy needs depends upon cost, safety, waste management and the ability to limit the associated proliferation risks. While all four considerations are important, this report exclusively examines proliferation risks.
The paper discusses issues and options for improving the budgeting and financial management
of the Nuclear Waste Fund (NWF). The issues and options would facilitate implementation of
any changes in program scope and content, or any changes in organization and management
structure. .
The three issues for possible administrative action include:
1. Instituting financial management enhancements to foster multi-year budgeting and
appropriations; combined accrual and cash budgeting; and separate capital budgeting;
The purpose of this study is to provide insights into the neutronic similarities that may exist between a
generic cask containing typical spent nuclear fuel assemblies and commercial reactor critical (CRC) state-
points. Forty CRC state-points from five pressurized-water reactors were selected for the study and the
type of CRC state-points that may be applicable for validation of burnup credit criticality safety
calculations for spent fuel transport/storage/disposal systems are identified. The study employed cross-
The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for all spent fuels and high-level wastes (HLW) that will eventually be disposed of in a geologic repository. The purpose of this document, and the information contained in the associated computerized data bases and supporting technical reports, is to provide the technical characteristics of the radioactive waste materials that will (or may) be accepted by DOE for interim storage in an MRS or emplacement in a repository as developed under the Nuclear Waste Policy Act Amendment of 1987.
A conservative end effect keff bias curve for actinide-only burnup credit casks is presented
in this paper. Rather than performing axially burnup-dependent analysis, cask designers can, if
they choose to, analyze casks with a uniform axial burnup (at assembly average burnup value) and
add the keff bias values to conservatively bound the actinide-only end effect. Earlier studies
suggested 1-3% increase in keff to account for the end effect, but they included fission products
as well as actinides for their analyses.
Because there is currently no designated disposal site for used nuclear fuel in the United States, the nation faces the prospect of extended long‐term storage (i.e., >60 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S.
The main question before the Transportation and Storage Subcommittee was whether the United States
should change its approach to storing and transporting spent nuclear fuel (SNF) and high-level
radioactive waste (HLW) while one or more permanent disposal facilities are established.
To answer this question and to develop specific recommendations and options for consideration by the
full Commission, the Subcommittee held multiple meetings and deliberative sessions, visited several
The Interim Staff Guidance on burnup credit (ISG-8, revision 2) for pressurized-water-reactor spent
nuclear fuel in storage and transport casks, issued in 2002 by the U.S. Nuclear Regulatory Commission’s
Spent Fuel Project Office, recommends an out-of-core burnup measurement to confirm the reactor record
and compliance with the assembly burnup value used for cask loading acceptance. This recommendation
is intended to prevent unauthorized loading (i.e., misloading) of assemblies due to inaccuracies in reactor
There have been roughly 2,600 shipments of commercial spent fuel in this country over the past three decades or so. Although this is not an enormous volume by European standards, it is nevertheless significant. These shipments fall into two general categories: individual and "campaign."
There have been a number of individual shipments where lead test assembly fuel was shipped from a reactor to a laboratory for examination. This is an important part of reactor fuel development.
America’s nuclear waste management program is at an impasse. The Obama Administration’s decision
to halt work on a repository at Yucca Mountain in Nevada is but the latest indicator of a policy that has
been troubled for decades and has now all but completely broken down. The approach laid out under
the 1987 Amendments to the Nuclear Waste Policy Act (NWPA)—which tied the entire U.S. high-level
waste management program to the fate of the Yucca Mountain site—has not worked to produce a
This report evaluates the potential for directly disposing of licensed commercial Dual Purpose
Canisters (DPCs) inside waste package overpacks without reopening. The evaluation considers
the principal features of the DPC designs that have been licensed by the Nuclear Regulatory
Commission (NRC) as these relate to thedesigns of waste packages and as they relate to
disposability in a repository in unsaturated volcanic tuff. Where DPC features appear to compromise future disposability in an unsaturated tuff (e.g., Yucca Mountain) repository
The Civilian Radioactive Waste Management System (CRWMS) Total System Model (TSM) is
a planning tool that estimates the logistic and cost impacts of various operational assumptions in
accepting radioactive wastes. Waste forms currently tracked are commercial spent nuclear fuel
(CSNF), Department of Energy (DOE) Spent Nuclear Fuel (DOE SNF), and High-Level
(radioactive) Waste (HLW). The TSM and associated programs analyze and simulate the actions
for waste acceptance from discharge until emplacement.
Dear Mr. President:
At your direction, the Secretary of Energy established the Blue Ribbon Commission on
America’s Nuclear Future to review policies for managing the back end of the nuclear
fuel cycle and recommend a new strategy. We are pleased to be serving as Co‐
Chairmen of the Commission, and we are writing to you to highlight an important action
we strongly believe should be reflected in your Fiscal Year 2013 baseline budget
projections.
In our draft report to the Secretary, issued in July of this year, the Commission
Dear Members of the South Carolina Congressional Delegation:
Thank you all for your letter of October 27th. We appreciate hearing your views on the
Yucca Mountain project, the safety benefits of deep geologic disposal, and the
importance of the retaining the H Canyon facility at the Department of Energy’s
Savannah River Site.
In our draft report, the Commission finds that deep geologic disposal is an essential
component of a comprehensive nuclear waste management system. Your comments