Atlas Railcar Project Phase 1-5 Reports and Atlas Interface Control Document
Publication Date
Abstract
| Authors | Date | |
|---|---|---|
| Atlas Railcar Phase 1 | Areva Federal Services LLC | 10/28/2016 |
| Atlas Railcar Phase 2 | Areva Federal Services LLC | 03/06/2018 |
| Atlas Railcar Phase 3 | Orano Federal Services LLC , Denton, Mark A. | 05/13/2019 |
| Atlas Railcar Phase 4 | Pinney, Chris , Cackovic, David , Walker, Russell | 07/21/2023 |
| Atlas Railcar Phase 5 | Belport, Steven , Walker, Russell , Trevithick, Shawn | 12/21/2023 |
| Interface Control Document | TechSource, Inc. , Dam, Scott A. , Feldman, Matthew , Reich, William | 11/01/2019 |
Document ID
EIR-3021970-000, P-22-012