Long-Term Criticality Control Issues for the MPC
Attachment | Size |
---|---|
LONG-TERM CRITICALITY CONTROL ISSUES FOR THE MPC.pdf (1.03 MB) | 1.03 MB |
This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) in response to a request received via a QAP-3-12 Design Input Data Request (Reference 5.1) from Waste Acceptance, Storage, & Transportation (WAST) Design (formerly MRSMPC Design). This design analysis is an answer to the Design Input Data Request to provide: Specific requirements for long-term criticality control. The time period for long-term criticality control requirements encompass the time phases of operations (pre-closure), containment (first 1,000 years post-closure), and isolation (the time period beyond the containment phase, at least to 10,000 years post-closure). The purpose and objective of this analysis is to provide specific long-term disposal criticality control requirements for the Multi-Purpose Canister (MPC) Subsystem Design Procurement Specification (DPS), so as to not preclude MPC compatibility with disposal in the MGDS.(References 5.2, 5.3, and 5.4) The response is stated in Section 8 herein and will be available for transmittal as an attachment to a QAP-3-12 Design Input Data Transmittal.