An Updated Perspective on the US Nuclear Fuel Cycle

There has been a resurgence of interest in the possibility of processing the US spent nuclear fuel, instead of burying it in a geologic repository. Accordingly, key topical findings from three relevant EPRI evaluations made in the 1990-1995 timeframe are recapped and updated to accommodate a few developments over the subsequent ten years. Views recently expressed by other US entities are discussed.

Criticality Risks During Transportation of Spent Nuclear Fuel

This report presents a best-estimate probabilistic risk assessment (PRA) to quantify the frequency of criticality accidents during railroad transportation of spent nuclear fuel casks. The assessment is of sufficient detail to enable full scrutiny of the model logic and the basis for each quantitative parameter contributing to criticality accident scenario frequencies. The report takes into account the results of a 2007 peer review of the initial version of this probabilistic risk assessment, which was published as EPRI Technical Report 1013449 in December 2006.

Evaluation of a Spent Fuel Repository at Yucca Mountain, Nevada

In June 2008, the U.S. Department of Energy (DOE) submitted a license application to the U.S. Nuclear Regulatory Commission (NRC) for the construction of a geologic repository at Yucca Mountain, Nevada, for the disposal of spent nuclear fuel and high-level radioactive waste. The license application was accepted for formal NRC review in September 2008. Throughout the more than 20-year history of the Yucca Mountain project, EPRI has performed independent assessments of key technical and scientific issues to facilitate an understanding of overall repository performance.

Program on Technology Innovation: Advanced Fuel Cycles - Impact on High-Level Waste Disposal

This report presents the results of a dynamic simulation analysis for deployment of advanced light water reactors (LWRs) and fast burner reactors, as proposed by the Global Nuclear Energy Partnership (GNEP) program. Conditions for the analysis were selected for their potential to challenge the nuclear fuel simulation codes that were used, due to the large variations in nuclear fuel composition for the burner reactors before equilibrium conditions are approached. The analysis was performed in a U.S.

Occupational Risk Consequences of the Department of Energy's Approach to Repository Design, Performance Assessment, and Operation in the Yucca Mountain License Application

EPRI has discovered several aspects of the U.S Department of Energy (DOE) proposed design and operation of the Yucca Mountain repository that—if implemented as described in the license application (LA)—could result in unnecessary occupational health and safety risk to workers involved with repository-related activities. This report identifies key DOE conservatisms and focuses on the occupational risk consequences of the DOE's approach to the repository design, performance assessment, and operation.

Program on Technology Innovation: Room at the Mountain

Projected expansion of nuclear power beyond the year 2014 will result in the need for commercial spent nuclear fuel (CSNF) management options in addition to the currently legislated CSNF storage capacity at the proposed Yucca Mountain geological repository. At present, 70,000 MTHM of storage capacity has been authorized, with a projection that 63,000 MTHM would be used for CSNF. This report extends preliminary analyses of the maximum physical capacity of the Yucca Mountain repository, presented in EPRI report 1013523.

Program on Technology Innovation: Summary of the National Academy of Sciences Report: "Going the Distance?"

In May 2003, The National Academy of Sciences (NAS) formed a Committee on Transportation of Radioactive Waste (NAS Committee) to examine the transportation of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The focus of this study was on the transportation of SNF in the United States.

Yucca Mountain Licensing Standard Options for Very Long Time Frames: Technical Bases for the Standard and Compliance Assessments

In the existing U.S. Environmental Protection Agency (EPA) and Nuclear Regulatory Commission (NRC) regulations governing the spent nuclear fuel and high-level radioactive waste site at Yucca Mountain, Nevada, the time period of compliance was set at 10,000 years. Recently, a Court ordered that EPA and NRC either revise the regulation on this topic to be "based upon and consistent with" recommendations made by a panel of the National Academy of Sciences, who recommended a time period of compliance out to as long as one million years, or seek congressional relief.

Spent Nuclear Fuel Transportation: An Overview

Spent nuclear fuel comprises a fraction of the hazardous materials packages shipped annually in the United States. In fact, at the present time, fewer than 100 packages of spent nuclear fuel are shipped annually. At the onset of spent fuel shipments to the proposed Yucca Mountain, Nevada, repository, the U.S. Department of Energy (DOE) expects to ship 400 - 500 spent fuel transport casks per year over the life of the facility.