Nuclear Waste: Operation of Monitored Retrievable Storage Facility is unlikely by 1998

DOE requested $100 million over the next 3 years to develop an MRS facility by 1998. DOE can begin accepting delivery of utilities’ waste by 1998 only by having an MRS facility then. To accomplish this, however, the Nuclear Waste Negotiator must complete a siting agreement and obtain congressional approval of the agreement, including the removal of statutory links to repository development, by the end of 1992. The negotiator does not believe this is possible.<br/><br/>Whether DOE is legally obligated to store or dispose of waste in 1998 is unclear.

Preliminary Site Requirements and Considerations for a Monitored Retrievable Storage Facility

In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel.

The Monitored Retrievable Storage Facility: Scoping the Environmental Assessment Process

Reaching negotiated agreement with a state or Indian tribe and preparing of 1he environmental assessment (EA) required by Section 404 of the Nuclear Waste Policy Act, as amended (NWPAA), are the first steps in a process intended to result in the acceptance of radioactive waste at a monitored retrievable storage (MRS) facility starting in 1998. This paper examines requirements for the EA, the first environmental document to be prepared for siting an MRS facility, and discusses the process used to develop that document.

A Monitored Retrievable Storage Facility: Technical Background Information

The U.S. Government is seeking a site for a monitored retrievable storage facility (MRS). Employing proven technologies used in this country and abroad, the MRS will be an integral part of the Federal system for safe and permanent disposal of the nation&#39;s high-level radioactive wastes. The MRS will accept shipments of spent fuel from commerical nuclear power plants, temporarily store the spent fuel above ground, and stage shipments of it to a geologic repository for permanent disposal.

Two Citizen Task Forces and the Challenge of the Evolving Nuclear Waste Siting Process

Siting any nuclear waste facility is problematic in today&#39;s climate of distrust toward nuclear agencies and fear of nuclear waste. This study compares and contrasts the siting and public participation processes as two citizen task forces dealt with their difficult responsibilities. Though one dealt with a high level waste (Monitored Retrievable Storage - MRS) proposal in Tennessee in 1985-6 and the other with a proposed low level waste facility in Illinois (1988 and still ongoing), the needs of citizen decision makers were very similar.

Nuclear Waste: Is There a Need for Federal Interm Storage?

The Monitored Retrievable Storage Review Commission herewith submits its<br/>final report as required by the Nuclear Waste Policy Amendments Act of 1987,<br/>Public Law 100-203, as amended by Public Law 100-507.<br/>The Congress created the Commission to provide a report on the need for a<br/>Federal monitored retrievable storage facility (MRS) as part of the Nation&#39;s<br/>nuclear waste management system. In essence, Congress asked the Commission to<br/>review the U.S.

Handling and final disposal of nuclear waste. September 1989

For those parts of the waste system that have already been taken into operation - transportation and handling systems, central interim storage facility for spent nuclear fuel (CLAB) and final repository for reactor waste (SFR)- the research and development stage has already largely been passed. The programme presented here therefore pertains primarily to the treatment and final disposal of spent fuel and the decommissioning of nuclear power plants.

Handling and final disposal of nuclear waste: Hard Rock Laboratory

In an international perspective, Sweden has come a long way in the development of safe and accepted systems for the management and disposal of radioactive waste. <br/><br/>A complete system for sea transport of spent nuclear fuel from the twelve Swedish nuclear reactors has been in operation since 1982. The spent nuclear fuel will be stored in CLAB for a period of about 40 years up until final disposal. The facility has been in operation since 1985. A final repository for low- and intermediate-level short-lived waste, SFR, has been in operation since April 1988.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.