Skip to main content

Identifying remaining socio-technical challenges at the national level: Canada

This country report on Canada contributes to the InSOTEC research programme’s Work Package 1.1 which maps remaining socio-technical challenges to the implementation of geological disposal of radioactive waste in fourteen countries in the EU and North America (www.insotec.eu). The aim of this country report is to provide an overview of the current situation of geological disposal of High Level radioactive Waste (HLW) and Spent Nuclear Fuel (SNF) in Canada.

CORWM’S ADVICE TO GOVERNMENT ON OPTIONS FOR THE ACCELERATION OF THE IMPLEMENTATION OF GEOLOGICAL DISPOSAL

This paper is a response to a request from the Department of Energy and Climate Change (DECC) for CoRWM’s advice on the 2011 review of options for accelerating the geological disposal programme carried out by the Radioactive Waste Management Directorate (RWMD) of the Nuclear Decommissioning Authority (NDA).

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Fourth Review Meeting of the Contracting Parties, 14 to 23 May 2012, Vienna, Austria, Final Summary Report

1. Recognizing the importance of the safe management of spent nuclear fuel and radioactive waste, the international community agreed upon the necessity of adopting a convention with the objective of achieving and maintaining a high level of safety worldwide in spent fuel and radioactive waste management: this was the origin of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (the “Joint Convention”), which was adopted on 5 September 1997 and entered into force on 18 June 2001. 2.

Nuclear Regulatory Authority of the Slovak Republic: 2011 Annual Report

The year 2011 was the year that marked the global nuclear industry and influenced the attitudes and activities of many professional, scientific and commercial organizations and spurred public interest in this branch of industry. Probably the whole world reacted to the natural disaster that struck Japan and damaged the nuclear power plant at Fukushima, Slovakia not excluded.

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Fourth Review Meeting in May 2012

There are currently nine power reactors in operation in Germany. These are exclusively light-water reactors (seven pressurised water reactors and two boiling water reactors whose fuel assemblies are composed of low-enriched uranium oxide or uranium/plutonium mixed oxide (MOX)).

Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report

On 8 December 1997 Belgium signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention by the Law of 2 August 2002. The ratification followed on 5 September 2002. The Convention became effective on 4 December 2002, i.e. 90 days following ratification. Belgium belongs to the group of Contracting Parties having at least one operational nuclear power plant on their territory.

Identifying remaining socio-technical challenges at the national level: Czech Republic

This report describes the history, recent developments and the current situation of the management of highly radioactive waste and spent nuclear fuel in the Czech Republic, with a particular focus on the development of geological disposal for this kind of waste. Special attention is given to the interplay of social and technical aspects of the process. The first chapter gives an overview of the state of affairs and sketches out the trajectories leading to it.

Identifying remaining socio-technical challenges at the national level: Hungary

This paper summarises the history of RWM in Hungary, with a special attention to changing decision making approaches, social conflicts, and socio-technical challenges. First the institutional background of RWM is outlined. Next, efforts to build facilities for the management of low- and intermediatelevel waste (L/ILRW) and high-level waste (HLW) are summarized. This is followed by the short description of remaining socio-technical challenges. Finally, changes in decision-making approaches and tools are analysed.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.