JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT FOURTH NATIONAL REPORT Argentina

The structure of the Fourth National Report complies with the Guidelines Regarding the
Form and Structure of National Reports (INFCIRC/604/Rev.1).

Section A describes the scope of the nuclear activity developed in Argentina since 1950
as well as the legal and regulatory framework. It also makes reference to the Strategic
Plan for Radioactive Waste Management (Strategic Plan), which refers to the safety of
Spent Fuel Management and Radioactive Waste Management.

Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages

A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.

Community

Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages

A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.

Community

ASSESSMENT OF THE GENERIC DISPOSAL SYSTEM SAFETY CASE for Information

The Committee on Radioactive Waste Management (CoRWM) has carried out an assessment of the generic Disposal System Safety Case (gDSSC) published by the Radioactive Waste Management Directorate (RWMD) of the Nuclear Decommissioning Authority (NDA) in February 2011. The assessment covered the whole suite of gDSSC documents, and related RWMD reports on research and development (R&D) and site characterisation.

Specific Design Principles for Deep Geological Repositories and Requirements for the Safety Case

The Swiss Federal Nuclear Safety Inspectorate (ENSI) is the regulatory authority for nuclear safety and security of the nuclear installations in Switzerland. ENSI issues guidelines either in its capacity as regulatory authority or based on a mandate in an ordinance. Guidelines are support documents that formalise the implementation of legal requirements and facilitate uniformity of implementation practices. They further concretise the state-of-the-art in science and technology.

Safety Case Plan

Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository.

RD&D-Programme 98 Treatment and final disposal of nuclear waste Programme for research, development and demonstration of encapsulation and geological disposal

During the next few years, SKB will add the results of county studies and additional feasibility studies to the background data for siting of the deep repository. We plan to be able to choose at least two sites for site investigations in 2001. The investigations, which will include test drillings, should be able to be started in 2002. An important milestone will thereby be passed in the siting work.<br/><br/>The technology for deep disposal will be tested on full scale at our laboratories in Oskarshamn.

Detailed programme for research and development 1999–2004

This report is a background to RD&D-Programme 98 /1-11. The report gives an account of most of the research and development being conducted by SKB. The current state of knowledge is described, along with the goals and programmes that govern the continued work. The period of immediate concern comprises the next three years, 1999-2001. Particulars for the three years following that are for natural reasons less detailed and mainly indicate a direction.

Treatment and final disposal of nuclear waste Detailed R&D-Programme 1993–1998

The goal of radioactive waste management in Sweden is to dispose of all radioactive waste products generated at the Swedish nuclear power plants in a safe manner. Furthermore, all other radioactive waste that arises in Sweden shall be safely disposed of.<br/>The Act on Nuclear Activities requires that the owners of the Swedish nuclear power plants adopt the measures that are needed to achieve this goal. The owners of the Swedish nuclear power plants have commissioned the Swedish Nuclear Fuel and Waste Management Company (SKB) to implement the measures that are needed.<br/>