Spent Nuclear Fuel: Accumulating Quantities at Commercial Reactors Present Storage and Other Challenges

The amount of spent fuel stored on-site at commercial nuclear reactors will continue to accumulate—increasing by about 2,000 metric tons per year and likely more than doubling to about 140,000 metric tons—before it can be moved off-site, because storage or disposal facilities may take decades to develop. In examining centralized storage or permanent disposal options, GAO found that new facilities may take from 15 to 40 years before they are ready to begin accepting spent fuel. Once an off-site facility is available, it will take several more decades to ship spent fuel to that facility.

Advanced Fuel Cycle Cost Basis

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites

This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department’s delay in performance under these contracts; provides a history of interim storage policy as it relates to commercial SN

Parametric Analysis of PWR Spent Fuel Depletion Parameters for Long-Term Disposal Criticality Safety

Utilization of burnup credit in criticality safety analysis for long-term disposal of spent
nuclear fuel allows improved design efficiency and reduced cost due to the large mass of fissile
material that will be present in the repository. Burnup-credit calculations are based on depletion
calculations that provide a conservative estimate of spent fuel contents (in terms of criticality
potential), followed by criticality calculations to assess the value of the effective neutron

Evaluation of Codisposal Viability for Aluminum-Clad DOE-Owned Spent Fuel: Phase II Degraded Codisposal Waste Package Internal Criticality

This report presents the analysis and conclusions with respect to disposal criticality for canisters containing aluminum-based fuels from research reactors. The analysis has been divided into three phases. Phase I, dealt with breached and flooded waste packages containing relatively intact canisters and intact internal (basket) structures; Phase II, the subject of this report, covers the degradation of the spent nuclear fuel (SNF) and structures internal to the codisposal waste package including high level waste (HLW), canisters, and critically control material.

Sensitivity Study of Reactivity Consequences to Waste Package Egress Area

The criticality consequence analysis for pressurized water reactor (PWR) waste packages (WP)
(Civilian Radioactive Waste Management System [CRWMS] Management and Operating
Contractor [M&O] 1997) focused on results obtained by maximizing postulated rates of
reactivity insertion to assure no synergistic reactions could occur among waste packages from
hypothetical criticality events. Other variables potentially influencing the criticality
consequences were held constant during the above referenced analysis. One of those variables

Acceptance Priority Ranking & Annual Capacity Report

The Nuclear Waste Policy Act of 1982, as amended (the Act), assigns the Federal Government the responsibility for the disposal of spent nuclear fuel and high-level waste. Section 302a of the Act authorized the Secretary to enter into contracts with the owners and generators of commercial spent nuclear fuel and or high level waste. The Standard Contract for Disposal of Spent Nuclear Fuel and or High Level Radioactive Waste (Standard Contract) established the contractual mechanism for the Department's acceptance and disposal of spent nuclear fuel and high level waste.

44-BWR WASTE PACKAGE LOADING CURVE EVALUATION

The objective of this calculation is to evaluate the required minimum burnup as a function of initial boiling water reactor (BWR) assembly enrichment that would permit loading of spent nuclear fuel into the 44 BWR waste package configuration as provided in Attachment IV. This calculation is an application of the methodology presented in ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2003). The scope of this calculation covers a range of enrichments from 0 through 5.0 weight percent (wt%) U-235, and a burnup range of 0 through 40 GWd/MTU.

TEV Collision with an Emplaced 5-DHLW/DOE SNF Short Co-Disposal Waste Package

The objective of this calculation is to determine the structural response of the 5-DHLW/DOE (Defense High Level Waste/Department of Energy) SNF (Spent Nuclear Fuel) Short Co-disposal Waste Package (WP) when subjected (while in the horizontal orientation emplaced in the drift) to a collision by a loaded (with WP) Transport and Emplacement Vehicle (TEV) due to an over-run. The scope of this calculation is limited to reporting the calculation results in terms of maximum total stress intensities (SIs) in the outer corrosion barrier (OCB).