Identifying remaining socio-technical challenges at the national level: Slovenia

The use of nuclear energy has a strong tradition in Slovenia. In 1949 the Institute Josef Stefan was founded, devoted to research in physics, with great emphasis on nuclear physics. A few years later (1966) the research nuclear reactor TRIGA started to work in the vicinity of capital city Ljubljana, to support its research.

Fourth Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia's obligation as a Contracting Party to this Convention.

Annual Report 2010 on Radiation and Nuclear Safety in the Republic of Slovenia

In 2010, there were no events that posed a serious radiological threat to the population in Slovenia. There were also no particularities in relation to the services of radiation practices and operators of radiation facilities.
The Krško NPP operated without shutdowns and production was interrupted only for the annual outage. In 2010, the power plant produced 5.7 TWh in total and achieved 89.9% availability. The nuclear power plant had no major problems during the September floods, when the Sava river otherwise seriously threatened settlements in Posavje.

Aspects of Governance in the Practical Implementation of the Concept of Reversibility for Deep Geological Disposal

The European project COWAM in Practice (CIP) was aimed to lead for three years (2007-2009) a process of monitoring, analyzing and evaluating the governance linked with radioactive waste management. This project, in cooperation with a research group and stakeholders, was conducted in parallel in 5 European countries (Spain, France, United Kingdom, Romania, Slovenia).

Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties

Answers to questions raised by other contracting parties under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management were prepared by the Slovenian Nuclear Safety Administration, the Kr_ko NPP, the Agency for Radwaste Management and the Ministry of Infrastructure and Spatial Planning.

Third Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia's obligation as a Contracting Party to this Convention.

Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Answers to questions raised by other contracting parties

Answers to questions raised by other contracting parties under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management were prepared by the Slovenian Nuclear Safety Administration, the Kr_ko NPP, the Agency for Radwaste Management and the Ministry of Infrastructure and Spatial Planning.

Second Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in ful- filment of Slovenia‘s obligation as a Contracting Party to this Convention.

First Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

The National Report on Fulfilment of the Obligations of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management is prepared in fulfilment of Slovenia’s obligation as a Contracting Party to this Convention.
This report was prepared by the Slovenian Nuclear Safety Administration. Contributions to the report were made by the Krško NPP, the Jožef Stefan Institute, the Agency for Radwaste Management, the Žirovski Vrh Uranium Mine and the Slovenian Radiation Protection Administration.