Skip to main content

Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants: A Guidance Manual for Users of Standard Technical Specifications (NUREG-0133)

This guidance manual provides the NRC staff methodology for calculating parameters for limiting conditions of operation required in the radiological effluent Technical Specifications for light-water-cooled nuclear power plants. it provides guidance in using the model specifications reported in NUREG-0472 (Revision 1)*, and NUREG-0473 (Revision 1)*, applicable to operating PWR and BWR licensees, and users of the Standard Technical Specifications packages available for various vendor designs.

Reflecting on the Implementing Geological Disposal Technology Platform as a knowledge network and potential scenarios for stakeholder involvement

This report was prepared in the context of Work Package 3 of the InSOTEC project. The overall objective of this work package (WP) is to take a closer look at arenas where socio-technical combinations on radioactive waste management (RWM) are formed. The attempt is to illustrate the interconnections between the sources of different types of information and knowledge development with the various stakeholders having access to that information.

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Report of the Federal Republic of Germany for the Fourth Review Meeting in May 2012

There are currently nine power reactors in operation in Germany. These are exclusively light-water reactors (seven pressurised water reactors and two boiling water reactors whose fuel assemblies are composed of low-enriched uranium oxide or uranium/plutonium mixed oxide (MOX)).

Kingdom of Belgium Fourth Meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report

On 8 December 1997 Belgium signed the Joint Convention. The Belgian legislator has expressed its consent with the obligations resulting from the Convention by the Law of 2 August 2002. The ratification followed on 5 September 2002. The Convention became effective on 4 December 2002, i.e. 90 days following ratification. Belgium belongs to the group of Contracting Parties having at least one operational nuclear power plant on their territory.

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, National Report from Norway, Fourth Review Meeting, 14-23 May 2012

This is the Norwegian report to the fourth review meeting to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (Joint Convention) to be held at IAEA in Vienna, 14–23 May 2012. Norway signed the Joint Convention on 29 September 1997, the day it was opened for signature. The Joint Convention was ratified and deposited on 12 January 1998.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.