Skip to main content

DOE Atlas Railcar Project End-of-Phase 2 Final Report

This is the DOE Atlas Railcar Project End-of-Phase 2 Final Report (Revision 1 from March 2018) that describes the technical progress through Phase 2 for the contract to design, analyze, and fabricate prototypes of cask and buffer railcars to transport spent nuclear fuel and high-level radioactive waste. This is the main body of the Phase 2 final report. There are a number of appendices referenced in the main body that will be posted to CURIE at a later time.
Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.