Detailed programme for research and development 1999–2004

This report is a background to RD&D-Programme 98 /1-11. The report gives an account of most of the research and development being conducted by SKB. The current state of knowledge is described, along with the goals and programmes that govern the continued work. The period of immediate concern comprises the next three years, 1999-2001. Particulars for the three years following that are for natural reasons less detailed and mainly indicate a direction.

RD&D-Programme 98 Treatment and final disposal of nuclear waste Programme for research, development and demonstration of encapsulation and geological disposal

During the next few years, SKB will add the results of county studies and additional feasibility studies to the background data for siting of the deep repository. We plan to be able to choose at least two sites for site investigations in 2001. The investigations, which will include test drillings, should be able to be started in 2002. An important milestone will thereby be passed in the siting work.<br/><br/>The technology for deep disposal will be tested on full scale at our laboratories in Oskarshamn.

Civilian Nuclear Spent Fuel Temporary Storage Options

The Department of Energy (DOE) is studying a site at Yucca Mountain, Nevada, for a permanent underground repository for highly radioactive spent fuel from nuclear reactors, but delays have pushed back the facility’s opening date to 2010 at the earliest. In the meantime, spent fuel is accumulating at U.S. nuclear plant sites at the rate of about 2,000 metric tons per year. Major options for managing those growing quantities of nuclear spent fuel include continued storage at reactors, construction of a DOE interim storage site near Yucca Mountain, and licensing of private storage facilities.

IAEA Information Circular - Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

1. The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management was adopted on 5 September 1997 by a Diplomatic Conference convened by the International Atomic Energy Agency at its headquarters from 1 to 5 September 1997. The Joint Convention was opened for signature at Vienna on 29 September 1997 during the forty-first session of the General Conference of the International Atomic Energy Agency and will remain open for signature until its entry into force. 2.

Site Selection and Characterization Processes for Deep Geologic Disposal of High Level Nuclear Waste

In this paper, the major elements of the site selection and characterization processes used in the U.S. high level waste program are discussed. While much of the evolution of the site selection and characterization processes have been driven by the unique nature of the U.S. program, these processes, which are well-defined and documented, could be used as an initial basis for developing site screening, selection, and characterization programs in other countries. Thus, this paper focuses more on the process elements than the specific details of the U.S. program.

Private Fuel Storage Facility Independent Spent Fuel Storage Installation

In accordance with the requirements of 10 CFR Part 72, Private Fuel Storage L.L.C. hereby applies for a specific license to receive, transfer and possess power reactor spent fuel and other radioactive material associated with spent fuel storage in an independent spent fuel storage installation (ISFSI) to be constructed and operated on the Skull Valley Indian Reservation in Tooele County, Utah. The license is requested for the storage of spent fuel discharged from licensed U.S. nuclear power reactors in dry storage systems designed by Holtec, International and Sierra Nuclear Corporation.

THE WIPP JOURNEY TO WASTE RECEIPT

In the early 1970s the federal government selected an area in southeastern New Mexico containing large underground salt beds as potentially suitable for radioactive waste disposal. An extensive site characterization program was initiated by the federal government. This site became the &quot;Waste Isolation Pilot Plant,&quot; better known as WIPP. It is now 1997, over two decades after the initial selection of the New Mexico site as a potential radioactive waste repository.