EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume II--U.S. Regulations for Geologic Disposal

U.S. efforts to site and construct a deep geologic repository for used fuel and high level radioactive waste (HLW) proceeded sporadically over a three-decade period from the late 1950s until 1982, when the U.S. Congress enacted the Nuclear Waste Policy Act (NWPA) codifying a national approach for developing a deep geologic repository. Amendment of the NWPA in 1987 resulted in a number of dramatic changes in direction for the U.S. program, most notably the selection of Yucca Mountain as the only site of the three remaining candidates for continued investigation.

EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned

The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.

EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste Volume I—The U.S. Site Selection Process Prior to the Nuclear Waste Policy Amendments Act

U.S. efforts to site and construct a deep geologic repository for used fuel and high level radioactive waste (HLW) proceeded in fits and starts over a three decade period from the late 1950s until 1982, when the U.S. Congress enacted the Nuclear Waste Policy Act (NWPA). This legislation codified a national approach for developing a deep geologic repository. Amendment of the NWPA in 1987 resulted in a number of dramatic changes in direction for the U.S. program, most notably the selection of Yucca Mountain as the only site of the three remaining candidates for continued investigation.

Environmental Permitting Guidance Radioactive Substances Regulation For the Environmental Permitting (England and Wales) Regulations 2010

This guidance is aimed at helping readers understand the permitting and other requirements specific to Radioactive Substances Regulation (RSR). The RSR regime covers
- more than one European Directive, parts of which are also implemented by other regulatory regimes which, to an extent, complement RSR;
- various Government policies and strategies; and

Dedicated-site, interim storage of high-level nuclear waste as part of the management system

Dedicated-site interim storage of high-level reprocessed nuclear waste and of spent fuel rods is proposed as a long-term integral part of the systems approach of the national nuclear waste isolation program. Separation of interim sites for retrievable storage from permanent-disposal repositories should enhance ensurance of the performance of the latter; maintenance of retrievability at separate sites also has many advantages in both safety and possible use of waste as resources.

Consolidated Interim Storage of Commercial Spent Nuclear Fuel

Approximately 54,000 tons of spent nuclear fuel are stored at operating nuclear power
plants and several decommissioned power plants throughout the country. Spent fuel
storage at these sites was never intended to be permanent. The current Federal plan is to
place the fuel in a repository for permanent disposal in Nevada at Yucca Mountain.
Recently, appropriations committees in Congress suggested building one or more Federal
sites for consolidated interim storage of spent fuel. Several reasons were identified. The

An Adaptive, Consent-Based Path to Nuclear Waste Storage and Disposal Solutions

This blog from DOE Secretary Moniz was released after a meeting with NARUC on February 12, 2014. The focus was on the BRC and the Administration strategy, with an emphasis on the importance of pursuing consolidated interim storage in parallel with looking at alternative sites for geologic disposal. A first priority is consent-based siting of a pilot-scale storage facility to accommodate used fuel from shutdown reactors.