Skip to main content

SALT REPOSITORY PROJECT CLOSEOUT STATUS REPORT

This report provides an overview of the scope and status of the U.S. Department of Energy's (DOE's) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report can be used as a "roadmap" into the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort.

A Multiattribute Utility Analysis of Sites Nominated for Characterization for the First Radioactive-Waste Repository: A Decision Aiding Methodology

In December 1984, the Department of Energy (DOE) published draft environmental assessments (EAs) to support the proposed<br/> nomination of five sites and the recommendation of three sites for characterization for the first radioactive-waste repository. A chapter common to all the draft EAs<br/>(Chapter 7) presented rankings of the five sites against the postclosure and the preclosure technical siting guidelines.

Program Plan for the Development of the Bedded Salt Pilot Plant

A program leading to the establishment in FY I983 of a pilot plant for storing radioactive wastes in bedded salt is described. The program consists of laboratory and field investigations of factors affecting the suitability of a specific site in southeastern New Mexico; of more generally applicable problems associated with geohydrology and rock mechanics; and of considerations bearing on the operational safety of a pilot plant repository. Tasks concerned with the engineering development and design of the facility are also included.