Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Proposed Rule
Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Proposed Rule
We, the Environmental Protection Agency (EPA), are proposing to revise certain of our public health and safety standards for radioactive material stored or disposed of in the potential repository at Yucca Mountain, Nevada. Section 801(a) of the Energy Policy Act of 1992 (EnPA, Pub. L. 102Ð 486) directed us to develop these standards. These standards (the 2001 standards) were originally promulgated on June 13, 2001 (66 FR 32074).
CONVENTION ON ACCESS TO INFORMATION, PUBLIC PARTICIPATION IN DECISION-MAKING AND ACCESS TO JUSTICE IN ENVIRONMENTAL MATTERS
CONVENTION ON ACCESS TO INFORMATION, PUBLIC PARTICIPATION IN DECISION-MAKING AND ACCESS TO JUSTICE IN ENVIRONMENTAL MATTERS
Funding Issues
Funding Issues
The purpose of this paper is to allow CoRWM to consider the range of issues concerning funding of a geological disposal facility (GDF) and of safe and secure interim storage, to note current developments and to identify issues that require further consideration or where CORWM should develop advice to Government.
On Petitions for Review of Orders of the EPA, the DOE, and the NRC
On Petitions for Review of Orders of the EPA, the DOE, and the NRC
In sum, we vacate 40 C.F.R. part 197 to the extent that it incorporates a 10,000-year compliance period because, contrary to EnPA section 801(a), that compliance period is not<br> "based upon and consistent with " the recommendations of the National Academy of Sciences. The remaining challenges to the EPA rule are without merit. We vacate the NRC rule insofar as it incorporates EPAÕs 10,000-year compliance period. In all other respects, we deny NevadaÕs petition for review challenging the NRC rule.
Analysis of the MUA Decision Methodology for HLW Repository Siting: Preclosure Utilities
Analysis of the MUA Decision Methodology for HLW Repository Siting: Preclosure Utilities
Utilities and ranking of the preclosure attributes of the proposed high-level radioactive waste repository are examined, in order to provide insights into the propriety of using this approach for this type of decision and an assessment of the adequacy of the analysis itself. The postclosure utilities obtained in the previous study were greater than 80% for all five sites considered, but showed a greater spread than those in the MUA. The preclosure multiattribute utilities also show a wider spread than in the MUA.
Response to Comments from the U.S. Department of Interior, State of Nevada, and Affected Counties on the Report of Early Site Suitability Evaluation of the Potential Repository Site at Yucca Mountain, Nevada
Response to Comments from the U.S. Department of Interior, State of Nevada, and Affected Counties on the Report of Early Site Suitability Evaluation of the Potential Repository Site at Yucca Mountain, Nevada
Comments contained in this document were received by the U.S. Department of Energy (DOE) on the Report of Early Site Suitability Evaluation (ESSE) of the Potential Repository Site at Yucca Mountain, Nevada, (Younker et al., 1992, SAIC 91/8000). Comments were received from the U.S. Department of Interior, the U.S. Nuclear Regulatory Commission, the State of Nevada, and several local affected governments in Nevada. No comments were received from members of the public.
A MOUNTAIN OF TROUBLE: A NATION AT RISK REPORT ON IMPACTS OF THE PROPOSED YUCCA MOUNTAIN HIGH-LEVEL NUCLEAR WASTE PROGRAM
A MOUNTAIN OF TROUBLE: A NATION AT RISK REPORT ON IMPACTS OF THE PROPOSED YUCCA MOUNTAIN HIGH-LEVEL NUCLEAR WASTE PROGRAM
Enclosed is the State of Nevada s report on impacts of the proposed Yucca Mountain nuclear waste repository program. This report is being provided pursuant to Section 114(a)(1)(H) and Section 116 of the Nuclear Waste Policy Act of 1982, as amended.
OECD/NEA: Belgium
OECD/NEA: Belgium
Recommendation Group 8
Recommendation Group 8
Recommendation Group 7 worked on expertise, the site selection process and compensation
Stakeholder Involvement and Confidence in the Process of Decision-making for the Disposal of Spent Nuclear Fuel in Finland
Response to Comments from the U.S. Nuclear Regulatory Commission on the Report of Early Site Suitability Evaluation of the Potential Repository Site at Yucca Mountain, Nevada
Response to Comments from the U.S. Nuclear Regulatory Commission on the Report of Early Site Suitability Evaluation of the Potential Repository Site at Yucca Mountain, Nevada
Comments contained in this document were received by the U.S. Department of Energy (DOE) on the Report of Early Site Suitability Evaluation (ESSE) of the Potential Repository Site at Yucca Mountain, Nevada, (Younker et al., 1992, SAIC 91/8000). Comments were received from the U.S. Department of Interior, the U.S. Nuclear Regulatory Commission, the State of Nevada, and several local affected governments in Nevada. No comments were received from members of the public.
Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada (40 CFR Part 197) -- Final Rule Response to Comments Document
Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada (40 CFR Part 197) -- Final Rule Response to Comments Document
EPA held a 90-day public comment period for the proposed radiation protection standards for Yucca Mountain (August 27, 1999 through November 26, 1999). Sixty-nine (69) sets of written comments were submitted to EPAÕs Air Docket regarding the proposed standards, although some commenters submitted more than one set of written comments. In addition, the Agency received oral testimony on the proposed standards from 28 speakers during public hearings that were held in Washington, DC; Las Vegas, NV; Amargosa Valley, NV; and Kansas City, MO.
Global Nuclear Energy Partnership
Global Nuclear Energy Partnership
GNEP Presentation to 2008 ECA Annual Conference
Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Final Rule
Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Final Rule
This final rule incorporates compliance criteria applicable at different times for protection of individuals and in circumstances involving human intrusion into the repository. Compliance will be judged against a standard of 150 microsieverts per year (_Sv/yr) (15 millirem per year (mrem/yr)) committed effective dose equivalent (CEDE) at times up to 10,000 years after disposal and against a standard of 1 millisievert per year (mSv/yr) (100 mrem/yr) CEDE at times after 10,000 years and up to 1 million years after disposal.
Final 10 CFR 960: General Guidelines for the Preliminary Screening of Potential Sites for a Nuclear Waste Repository
Final 10 CFR 960: General Guidelines for the Preliminary Screening of Potential Sites for a Nuclear Waste Repository
These guidelines were developed in accordance with the requirements of Section 112(a) of the Nuclear Waste Policy Act of 1982 for use by the Secretary of Energy in evaluating the suitability of sites. The guidelines will be used for suitability evaluations and determinations made pursuant to Section 112(b). The guidelines set forth in this part are intended to complement the requirements set forth in the Act, 10 CFR part 60, and 40 CFR part 191. The DOE recognizes NRC jurisdiction for the resolution of differences between the guidelines and 10 CFR part 60.
Radioactive Waste Management and Decommissioning in Austria
Radioactive Waste Management and Decommissioning in Austria
D1-10 Prospective Case Study - Slovenia
D1-10 Prospective Case Study - Slovenia
Summary Statement - Regulations for Geological Disposal of High-Level Radioactive Waste
Summary Statement - Regulations for Geological Disposal of High-Level Radioactive Waste
Presented on September 2010 to the Blue Ribbon Commission on America's Nuclear Future (Disposal Subcommittee)
D1-11 Prospective Case Study - Spain
D1-11 Prospective Case Study - Spain
D1-8 Prospective Case Study - France
D1-8 Prospective Case Study - France
End of FY10 Report – Used Fuel Disposition Technical Bases and Lessons Learned Legal and Regulatory Framework for High-Level Waste Disposition in the United States
End of FY10 Report – Used Fuel Disposition Technical Bases and Lessons Learned Legal and Regulatory Framework for High-Level Waste Disposition in the United States
This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of The North Shore
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of The North Shore
On March 21, 2012, the Township of The North Shore expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the Township of The North Shore against five screening criteria using readily-available information.
Nuclear Waste Policy Act (Section 112), Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive Waste Repository
Nuclear Waste Policy Act (Section 112), Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive Waste Repository
The Nuclear Waste Policy Act of 1982 (the Act), established a step-by-step process for the siting of the nation's first repository for high-level radioactive waste and spent fuel. The Act gave the Department of<br/>Energy (DOE) the primary responsibility for conducting this siting process.