Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Country
Keywords
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Approximately 54,000 tons of spent nuclear fuel are stored at operating nuclear power plants and several decommissioned power plants throughout the country. Spent fuel storage at these sites was never intended to be permanent. The current Federal plan is to place the fuel in a repository for permanent disposal in Nevada at Yucca Mountain.
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
This report has been prepared by an ad-hoc Working Group (WG) formed by ANDRA (France), NUMO (Japan), NAGRA (Switzerland) and ENRESA (Spain) in May 2003, after the EDRAM meeting held in Valencia to study the situation in the different EDRAM member countries regarding the treatment of radioactive waste ownership and management of long-term liabilities.
The Report to the President and the Congress by the Secretary of Energy on the Need to a Second Repository
The Report to the President and the Congress by the Secretary of Energy on the Need to a Second Repository
The Nuclear Waste Policy Act of 1982, as amended (NWPA), establishes a process for the siting, construction and operation of one or more national repositories for permanent disposal of the Nation’s spent nuclear fuel (SNF) and high-level radioactive waste (HLW). In 1987, after the Department of Energy (the Department or DOE) had conducted studies of nine potential repository sites located throughout the United States, Congress amended the NWPA and selected the Yucca Mountain site in Nye County, Nevada as the only site for further study for the first national repository.
Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive-Waste Repository
Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive-Waste Repository
The Nuclear Waste Policy Act of 1982 (the Act), established a
step-by-step process for the siting of the nation's first repository for
high-level radioactive waste and spent fuel. The Act gave the Department of
Energy (DOE) the primary responsibility for conducting this siting process.
The first step in the process laid out in the Act was the development by
the DOE, with the concurrence of the Nuclear Regulatory Commission (NRC), of
general guidelines to be used by the Secretary of the DOE (the Secretary) in
A Technology Roadmap for Generation IV Nuclear Energy Systems, Ten Nations Preparing Today for Tomorrow's Energy Needs
A Technology Roadmap for Generation IV Nuclear Energy Systems, Ten Nations Preparing Today for Tomorrow's Energy Needs
The world’s population is expected to expand from
about 6 billion people to 10 billion people by the year
2050, all striving for a better quality of life. As the
Earth’s population grows, so will the demand for energy
and the benefits that it brings: improved standards of
living, better health and longer life expectancy, improved
literacy and opportunity, and many others.
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
Managing the Nation's Commercial High-Level Radioactive Waste
Managing the Nation's Commercial High-Level Radioactive Waste
With the passage of the Nuclear Waste Policy Act of 1982 (NWPA), Congress for the first time established in law a comprehensive Federal policy for commercial high-level radioactive waste management, including interim storage and permanent disposal. NWPA provides sufficient authority for
developing and operating a high-level radioactive waste management system based on disposal in mined geologic repositories. Authorization
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Confidence in the Long-term Safety of Deep Geological Repositories--Its Development and Communication
Confidence in the Long-term Safety of Deep Geological Repositories--Its Development and Communication
Confidence in the long-term safety of deep geological disposal, and the ways in which this
confidence can be obtained and communicated, are topics of great importance to the radioactive waste
management community.1
The technical aspects of confidence have been the subject of considerable debate, especially
the concept of model validation. It has, for example, been pointed out that it is impossible to describe
fully the evolution of an open system, such as a repository and its environment, that cannot be
A Multiattribute Utility Analysis of Sites Nominated for Characterization for the First Radioactive-Waste Repository--A Decision-Aiding Methodology
A Multiattribute Utility Analysis of Sites Nominated for Characterization for the First Radioactive-Waste Repository--A Decision-Aiding Methodology
The Department of Energy (DOE), pursuant to the Atomic Energy Act of 1954
as amended, the Energy Reorganization Act of 1974, the Department of Energy
Organization Act of 1977, and the Nuclear Waste Policy Act of 1982 (the Act),
has the responsibility to provide for the disposal of high-level radioactive
waste and spent nuclear fuel.* The DOE selected mined geologic repositories
as the preferred means for the disposal of commercially generated high-level
radioactive waste and spent fuel (Federal Register, Vol. 46, p. 26677, May 14,
Locating a radioactive waste repository in the ring of fire
Locating a radioactive waste repository in the ring of fire
The scientific, technical, and sociopolitical challenges of finding a secure site for a geological repository for radioactive wastes have created a long and stony path for many countries. Japan carried out many years of research and development before taking its first steps in site selection.
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
Management of Uncertainty in Safety Cases and the Role of Risk - Workshop Proceedings
The development of radioactive waste repositories involves consideration of how the waste and the
engineered barrier systems will evolve, as well as the interactions between these and, often relatively
complex, natural systems. The timescales that must be considered are much longer than the timescales
that can be studied in the laboratory or during site characterisation. These and other factors can lead to
various types of uncertainty (on scenarios, models and parameters) in the assessment of long-term,
Partnering for Long-Term Management of Radioactive Waste - Evolution and Current Practice in Thirteen Countries
Partnering for Long-Term Management of Radioactive Waste - Evolution and Current Practice in Thirteen Countries
National radioactive waste management programmes are in various phases of siting facilities and rely on distinct technical approaches for different categories of waste. In all cases, it is necessary for institutional actors and the potential or actual host community to build a meaningful, workable relationship. Partnership approaches are effective in achieving a balance between the requirements of fair representation and competent participation.
H12: Project to Establish the Scientific and Technical Basis for HLW Disposal in Japan Project Overview Report
H12: Project to Establish the Scientific and Technical Basis for HLW Disposal in Japan Project Overview Report
As outlined in the overall program for high-level waste (HLW) management in Japan, defined by the Atomic Energy Commission (AEC), HWL separated from spent nuclear fuel during reprocessing will be immobilized in a glass matrix and stored for a period of 30 to 50 years to allow cooling; it will then be disposed of in a stable deep geological formation.
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
The Nuclear Waste Policy Act of 1982 (NWPA) established a program to deal comprehensively with the waste byproducts of nuclear power generation, as well as defense-related radioactive wastes, if appropriate. Under this program, the federal Department of Energy (DOE) must locate and develop a site for disposal of high-level radioactive wastes in a geologic setting capable of isolating them from adverse public and environmental exposure for at least 10,000 and up to 100,000 years.
Evaluating Site Suitability for a HLW Repository
Evaluating Site Suitability for a HLW Repository
The primary objective of government policy, and of NUMO in implementing this policy, is to
ensure that a repository for Japan’s high-level radioactive waste is located so as to provide
secure isolation of the waste and adequate safety for present and future generations. This
means that the site has to be chosen carefully, taking full account of all its characteristics. In
order to address these characteristics in an orderly and structured manner, we have established
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.
Japan's Spent Fuel and Plutonium Management Challenges
Japan's Spent Fuel and Plutonium Management Challenges
Japan’s spent fuel management and fuel cycle programs are now at a critical stage. Its first commercial-scale reprocessing plant, at Rokkasho Village, will soon start full-scale operation.
Disposal and Storage of Spent Nuclear Fuel--Finding the Right Balance--A Report to Congress and the Secretary of Energy
Disposal and Storage of Spent Nuclear Fuel--Finding the Right Balance--A Report to Congress and the Secretary of Energy
The Nuclear Waste Policy Act of 1982, as amended, established a statutory basis
for managing the nation’s civilian (or commercially produced) spent nuclear
fuel. The law established a process for siting, developing, licensing, and constructing
an underground repository for the permanent disposal of that waste.
Utilities were given the primary responsibility for storing spent fuel until it is
accepted by the Department of Energy (DOE) for disposal at a repository —
originally expected to begin operating in 1998. Since then, however, the repository
Options for Developing Public and Stakeholder Engagement for the Storage and Management of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States
Options for Developing Public and Stakeholder Engagement for the Storage and Management of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States
This report puts forth a number of options and recommendations for how to engage
stakeholders and other members of the public in the storage and management of spent
nuclear fuel and high level waste in the United States. The options are generated from a
scientific review of existing publications proposing criteria for assessing past efforts to
engage publics and stakeholders in decision-making about risky technologies. A set of
nine principles are derived for evaluating cases of public and stakeholder engagement with
Key Issues Associated with Interim Storage of Used Nuclear Fuel
Key Issues Associated with Interim Storage of Used Nuclear Fuel
The issue of interim storage of used (spent)1 fuel is dependent on a number of key factors, some
of which are not known at this time but are the subject of this study. The first is whether or not
the Yucca Mountain Project continues or is cancelled such that it may be able to receive spent
fuel from existing and decommissioned nuclear power stations. The second is whether the United
States will pursue a policy of reprocessing and recycling nuclear fuel. The reprocessing and
Evaluation of a Spent Fuel Repository at Yucca Mountain, Nevada
Evaluation of a Spent Fuel Repository at Yucca Mountain, Nevada
In June 2008, the U.S. Department of Energy (DOE) submitted a license application to the U.S. Nuclear Regulatory Commission (NRC) for the construction of a geologic repository at Yucca Mountain, Nevada, for the disposal of spent nuclear fuel and high-level radioactive waste. The license application was accepted for formal NRC review in September 2008. Throughout the more than 20-year history of the Yucca Mountain project, EPRI has performed independent assessments of key technical and scientific issues to facilitate an understanding of overall repository performance.
An Updated Perspective on the US Nuclear Fuel Cycle
An Updated Perspective on the US Nuclear Fuel Cycle
There has been a resurgence of interest in the possibility of processing the US spent nuclear fuel, instead of burying it in a geologic repository. Accordingly, key topical findings from three relevant EPRI evaluations made in the 1990-1995 timeframe are recapped and updated to accommodate a few developments over the subsequent ten years. Views recently expressed by other US entities are discussed.
Revisiting America's Nuclear Waste Policy
Revisiting America's Nuclear Waste Policy
With the first 100 days of the Obama Administration behind us, the Institute for 21st Century Energy presents
this nuclear waste policy document that recounts the history of the country’s nuclear waste policy, discusses
the mechanics of the issue, and off ers specifi c recommendations to the Obama Administration and the
U.S. Congress.
Two weeks aft er the 2008 presidential election, the Institute released dozens of energy policy recommendations for
the incoming administration and 111th Congress. Ten recommendations focused on committing to and expanding