Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
Monitored Retrievable Storage Facility Design Criteria Policy Document - 2nd Draft
Monitored Retrievable Storage Facility Design Criteria Policy Document - 2nd Draft
Monitored Retrievable Storage Facility Conceptual Design Report
Monitored Retrievable Storage Facility Conceptual Design Report
Preliminary Site Requirements and Considerations for a Monitored Retrievable Storage Facility
Preliminary Site Requirements and Considerations for a Monitored Retrievable Storage Facility
In the November 1989 Report to Congress on Reassessment of the Civilian
Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy
announced an initiative for developing a monitored retrievable storage (MRS) facility
that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by
the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from
commercial nuclear power plants and provide a limited amount of storage for this
Preliminary Feasibility Assessment for Several Specific MRS Design Alternatives with the Potential for Early Deployment Revision1
Preliminary Feasibility Assessment for Several Specific MRS Design Alternatives with the Potential for Early Deployment Revision1
This vintage 1990 document presents the results of WESTON'S preliminary assessment of the feasibility of several alternative fuel-transfer and storage concepts that have the potential for early spent-fuel acceptance at an MRS facility. The feasibility study was part of a series of studies conducted by the U.S. Department of Energy (DOE) during the late 1980's and early 1990's in an effort to establish an MRS design configuration.
MRS Siting Briefing
MRS Siting Briefing
This briefing paper is a component of the comprehensive briefing package developed for the Negotiator, and describes previous DOE experience in its attempt to site an MRS facility. The Background section highlights, in chronological order, significant events in DOE's MRS siting history from enactment of the Nuclear Waste Policy Act of 1982 to the issuance of the "Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program" in November 1989.
Monitored Retrievable Storage Submission to Congress-Rev. 1
Monitored Retrievable Storage Submission to Congress-Rev. 1
In response to Section 141 of the Nuclear Waste Policy Act of 1982, the Department of Energy hereby submits a proposal for the construction of a facility for monitored retrievable storage (MRS). The approval of this proposal by the Congress would specifically--
• Approve the construction of an MRS facility at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee.
• Limit the storage capacity at the MRS site to 15,000 metric tons of uranium.
Managing the Nation's Commercial High-Level Radioactive Waste
Managing the Nation's Commercial High-Level Radioactive Waste
With the passage of the Nuclear Waste Policy Act of 1982 (NWPA), Congress for the first time established in law a comprehensive Federal policy for commercial high-level radioactive waste management, including interim storage and permanent disposal. NWPA provides sufficient authority for
developing and operating a high-level radioactive waste management system based on disposal in mined geologic repositories. Authorization
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
House Report 97-491, Part 1, “Report to Accompany H.R. 3809" Pg 44
House Report 97-491, Part 1, “Report to Accompany H.R. 3809" Pg 44
This report accompanies the Nuclear Waste Policy Act of 1982. Only page 44 is included in this PDF.
Monitored Retrievable Storage Project Plan
Monitored Retrievable Storage Project Plan
The purpose of this document is to describe the Monitored Retrievable Storage (MRS) Project and to establish approved cost and schedule baselines against which overall progress and management effectiveness shall be measured. For the sake of brevity, this Project Plan will be referred to as the Plan throughout this document.
The DOE Position on the MRS Facility
The DOE Position on the MRS Facility
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
The purpose of this document is to provide waste quantity and sequencing information that serves as the design basis for commercial spent nuclear fuel (CSNF) arriving at the repository, and the information on the transportation systems that will be used to deliver this fuel. It is intended as input for waste package and repository design analyses needed to ensure that facilities are flexible enough to be capable of receiving, unloading, handling, and emplacing the amounts and types of CSNF expected for receipt under realistic bounding conditions.