Monitored Retrievable Storage Project Plan
Attachment | Size |
---|---|
MRS Project Plan draft.pdf (4 MB) | 4 MB |
The purpose of this document is to describe the Monitored Retrievable Storage (MRS) Project and to establish approved cost and schedule baselines against which overall progress and management effectiveness shall be measured. For the sake of brevity, this Project Plan will be referred to as the Plan throughout this document.
The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System (PMS) Manual defines the Plan as a Program-level controlled document that is submitted through the Director, OCRWM, to the Acquisition Executive/Energy Systems Acquisition Advisory Board (ESAAB) Chairman for approval. Initial issuance and changes to this plan shall be controlled by the Program Change Control Board with copies of all page changes forwarded to the ESAAB Secretariat for information purposes. The Plan complies with Department of Energy (DOE) Order 4700.1, as revised by DOE Notice 4700.4A and Secretary of Energy Notice (SEN)-27-90.
This Plan addresses activities through the completion of the final MRS Facility construction phase, including startup activities required to qualify the facility for the receipt of spent nuclear fuel. The Project Charter (Appendix A) delineates management responsibility, authority, and accountability of the project office along with operational management relationships with the OCRWM, other department elements, and external organizations.