Big Rock Point: Operation, Decommissioning, and the Interim Storage of Spent Nuclear Fuel
Big Rock Point: Operation, Decommissioning, and the Interim Storage of Spent Nuclear Fuel
Fact Sheet - Big Rock Point
Fact Sheet - Big Rock Point
RD&D Programme 2007 presents SKB’s plans for research, development and demonstration during<br/>the period 2008–2013. The plans for the first three-year period are for natural reasons more detailed<br/>than those for the next one.
This report puts forth a number of options and recommendations for how to engage stakeholders and other members of the public in the storage and management of spent nuclear fuel and high level waste in the United States. The options are generated from a scientific review of existing publications proposing criteria for assessing past efforts to engage publics and stakeholders in decision-making about risky technologies.
In mid-1997, a Wyoming-led group of companies announced plans to develop a private interim spent fuel storage project in Wyoming to be known as the Owl Creek Energy Project. The idea for the Wyoming project had been developed under the earlier 1990s Nuclear Waste Negotiator Program. During that earlier activity, the project would have been a U.S. Department of Energy (DOE) project.
Historical inventories of spent fuel are combined with U.S Department of Energy (DOE) projections of future discharges from commercial nuclear reactors in the United States to provide estimates of spent fuel storage requirements over the next 50 years, through the year 2040. The needs for storage capacity beyond that presently available in the pools are estimated. These estimates incorporate the maximum capacities within current-and planned in-pool storage facilities and any planned transshipments of fuel to ther reactors or, facilities.
There are no nuclear power plants in Utah. Despite that, Utah is targeted to be the site of the largest facility ever licensed for storage of spent nuclear fuel rods (high-level nuclear waste) from nuclear power plants. This proposed site would store up to 40,000 metric tons of spent nuclear fuel. The storage of this amount of waste in one location is equivalent to all the commercial spent nuclear fuel rods in the United States. The Federal government has responsibility for permanently storing this high-level nuclear waste, but after 18 years, it has missed the deadline.
The Department of Energy (DOE) is studying a site at Yucca Mountain, Nevada, for a permanent underground repository for highly radioactive spent fuel from nuclear reactors, but delays have pushed back the facility’s opening date to 2010 at the earliest. In the meantime, spent fuel is accumulating at U.S. nuclear plant sites at the rate of about 2,000 metric tons per year. Major options for managing those growing quantities of nuclear spent fuel include continued storage at reactors, construction of a DOE interim storage site near Yucca Mountain, and licensing of private storage facilities.
SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection<br/>is the end result of an extensive siting process that began in the early 1990s. The strategy and<br/>plan for the work was based on experience from investigations and development work over a period<br/>of more than ten years prior to then.<br/>This document describes the siting work and SKB’s choice of site for the final repository.
Understanding the Choices is the NWMO’s second discussion document, an important milestone in a three-year study (2002-2005) designed to recommend to the Government of Canada an approach to managing Canada’s used nuclear fuel for the long term. The report begins with an examination of the values and priorities of Canadians, and how the NWMO has used this understanding to build a framework to assess and compare management approaches.
On September 13, 2010, the English River First Nation expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of thirteen English River First Nation reserve areas against five screening criteria using readily available information.
The primary task of the Committee on Radioactive Waste Management (CoRWM) is to provide independent scrutiny of the Government’s and Nuclear Decommissioning Authority’s proposal, plans and programmes to deliver geological disposal, together with robust interim storage, as the long-term<br/>management option for the UK’s higher activity wastes. In June 2007 the Scottish Executive announced a policy of near-surface, near-site long-term storage rather than geological disposal.
Posiva webpage discussing selecting the site for final disposal of spent fuel.
A summary of nuclear waste management in Finland, including energy use statistics, principles of nuclear waste management, financing, how waste is disposed of, the underground research laboratory, and the authorities involved in nuclear waste management.
This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department’s delay in performance under these contracts; provides a history of interim storage policy as it relates to commercial SN
This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models.