Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Country
Keywords
Updated Evaluation of Burnup Credit for Accommodating PWR Spent Nuclear Fuel in High-Capacity Cask Designs
Updated Evaluation of Burnup Credit for Accommodating PWR Spent Nuclear Fuel in High-Capacity Cask Designs
Current Status and Potential Benefits of Burnup Credit for Spent Fuel Transportation
Current Status and Potential Benefits of Burnup Credit for Spent Fuel Transportation
PWR Burnup Credit Using Both Belts and Suspenders
PWR Burnup Credit Using Both Belts and Suspenders
Experimental Investigation of Burnup Credit for Safe Transport, Storage, and Disposal of Spent Nuclear Fuel
Experimental Investigation of Burnup Credit for Safe Transport, Storage, and Disposal of Spent Nuclear Fuel
Recommendations for PWR Storage and Transportation Casks That Use Burnup Credit
Recommendations for PWR Storage and Transportation Casks That Use Burnup Credit
Burnup Credit - Technical Basis for Spent-Fuel Burnup Verification
Burnup Credit - Technical Basis for Spent-Fuel Burnup Verification
Present regulatory practices provide as much burnup credit flexibility as can be currently
expected. Further progress is achievable by incorporating the negative reactivity effects of a
subset of neutron-absorbing fission-product isotopes, and by optimizing the procedural approach
for establishing the burnup characteristics of the spent fuel to be loaded in burnup-creditdesigned
storage and transportation systems. This report describes progress toward developing a
Fission Product Experiment Program: Validation and Calculational Analysis
Fission Product Experiment Program: Validation and Calculational Analysis
From 1998 to 2004, a series of critical experiments referred to as the fission product (FP) experimental program was performed at the Commissariat à l'Energie Atomique Valduc research facility. The experiments were designed by Institut de Radioprotection et de Sûreté Nucléaire (IRSN) and funded by AREVA NC and IRSN within the French program supporting development of a technical basis for burnup credit validation.
Improved Radiochemical Assay Analyses Using TRITON Depletion Sequences in SCALE
Improved Radiochemical Assay Analyses Using TRITON Depletion Sequences in SCALE
BWR Axial Profile
BWR Axial Profile
Transportation and Storage Subcommittee Report to the Full Commission - Updated Report
Transportation and Storage Subcommittee Report to the Full Commission - Updated Report
To organize its investigation of whether changes are needed in the nation’s current approach to storing and eventually transporting spent nuclear fuel (SNF) and high-level waste (HLW), the Subcommittee began by asking a series of related questions:
• What role should storage play in an integrated U.S. waste management system and strategy in the future?
Options for Developing Public and Stakeholder Engagement for the Storage and Management of Spent Nuclear Fuel (SNF) and High Lievel Waste (HLW) in the United States
Options for Developing Public and Stakeholder Engagement for the Storage and Management of Spent Nuclear Fuel (SNF) and High Lievel Waste (HLW) in the United States
This report puts forth a number of options and recommendations for how to engage
stakeholders and other members of the public in the storage and management of spent
nuclear fuel and high level waste in the United States. The options are generated from a
scientific review of existing publications proposing criteria for assessing past efforts to
engage publics and stakeholders in decision-making about risky technologies. A set of
nine principles are derived for evaluating cases of public and stakeholder engagement with
JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT SECOND NATIONAL REPORT
JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT SECOND NATIONAL REPORT
This report describes the actions taken in Argentina on the safety of spent fuel management
(SF) and on the safety of radioactive waste management, in order to provide evidence of the
fulfillment of its obligations under the Joint Convention. To facilitate the reading and a better
understanding of this report a summary of those parts of the 1st Report that were considered
necessary have been included.
JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT THIRD NATIONAL REPORT
JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT THIRD NATIONAL REPORT
The present National Report describes the actions taken in Argentina on the safety of spent fuel
(SF) management and on the safety of radioactive waste (RW) management, in order to provide
evidence of the fulfilment of the obligations derived from the Joint Convention. To facilitate the
reading and a better understanding, it has been decided to include a summary of those parts of
the two prior National Reports that are considered necessary in order to comply with this
objective.
Interim Storage of Spent Nuclear Fuel A Safe, Flexible, and Cost-Effective Near-Term Approach to Spent Fuel Management
Interim Storage of Spent Nuclear Fuel A Safe, Flexible, and Cost-Effective Near-Term Approach to Spent Fuel Management
The management of spent fuel from nuclear power
plants has become a major policy issue for virtually every
nuclear power program in the world. For the nuclear industry, finding sufficient capacity for storage and processing or
disposal of spent fuel is essential if nuclear power plants are
to be allowed to continue to operate. At the same time, the
options chosen for spent fuel management can have a substantial impact on the political controversies, proliferation
risks, environmental hazards, and economic costs of the
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
The Nuclear Waste Policy Act of 1982 (NWPA) established a program to deal comprehensively with the waste byproducts of nuclear power generation, as well as defense-related radioactive wastes, if appropriate. Under this program, the federal Department of Energy (DOE) must locate and develop a site for disposal of high-level radioactive wastes in a geologic setting capable of isolating them from adverse public and environmental exposure for at least 10,000 and up to 100,000 years.
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.
Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation
Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation
Pressurized water reactor (PWR) burnup credit validation is
demonstrated using the benchmarks for quantifying fuel reactivity
decrements, published as Benchmarks for Quantifying Fuel Reactivity
Depletion Uncertainty, Electric Power Research Institute (EPRI)
report 1022909. This demonstration uses the depletion module
TRITON (Transport Rigor Implemented with Time-Dependent
Operation for Neutronic Depletion) available in the SCALE 6.1
(Standardized Computer Analyses for Licensing Evaluations) code
Burnup Credit — Contribution to the Analysis of the Yankee Rowe Radiochemical Assays
Burnup Credit — Contribution to the Analysis of the Yankee Rowe Radiochemical Assays
This report presents a methodology for validation of the isotopic
contents of spent light water reactor fuel for actinide-only burnup
credit with additional high-quality radiochemistry assay (RCA) data
obtained from the Yankee Rowe pressurized water reactor. The
additional Yankee Rowe RCA data were not included in previous
isotopic validation studies for burnup credit due to the difficulty of
accurately modeling the complex Yankee Rowe fuel assembly design
using the SAS2H one-dimensional sequence of the earlier SCALE
Impacts Associated with Transfer of Spent Nuclear Fuel from Spent Fuel Storage Pools to Dry Storage After Five Years of Cooling
Impacts Associated with Transfer of Spent Nuclear Fuel from Spent Fuel Storage Pools to Dry Storage After Five Years of Cooling
In order to decrease the risk of terrorism, it has been suggested that used nuclear fuel should be
moved to dry storage early, after five years cooling in the spent fuel pool. The Nuclear
Regulatory Commission (NRC) has reviewed this issue and issued a white paper stating that it
did not believe such a measure was justified in light of additional security measures implemented
at nuclear plants and the impacts associated with the early movement of used fuel into dry
Japan's Spent Fuel and Plutonium Management Challenges
Japan's Spent Fuel and Plutonium Management Challenges
Japan’s spent fuel management and fuel cycle programs are now at a critical stage. Its first commercial-scale reprocessing plant, at Rokkasho Village, will soon start full-scale operation.
Disposal and Storage of Spent Nuclear Fuel--Finding the Right Balance--A Report to Congress and the Secretary of Energy
Disposal and Storage of Spent Nuclear Fuel--Finding the Right Balance--A Report to Congress and the Secretary of Energy
The Nuclear Waste Policy Act of 1982, as amended, established a statutory basis
for managing the nation’s civilian (or commercially produced) spent nuclear
fuel. The law established a process for siting, developing, licensing, and constructing
an underground repository for the permanent disposal of that waste.
Utilities were given the primary responsibility for storing spent fuel until it is
accepted by the Department of Energy (DOE) for disposal at a repository —
originally expected to begin operating in 1998. Since then, however, the repository
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.
Sensitivity and Uncertainty Analysis of Commercial Reactor Criticals for Burnup Credit
Sensitivity and Uncertainty Analysis of Commercial Reactor Criticals for Burnup Credit
This paper provides insights into the neutronic similarities between a representative high-capacity rail-transport cask containing typical pressurized water reactor (PWR) spent nuclear fuel assemblies and critical reactor state-points, referred to as commercial reactor critical (CRC) state-points. Forty CRC state-points from five PWRs were analyzed, and the characteristics of CRC state-points that may be applicable for validation of burnup-credit criticality safety calculations for spent fuel transport/storage/disposal systems were identified.