Category of Content
Siting Experience Documents Only
Publication Date
Country
Keywords
DOE’s Centralized Storage Design Alternatives and Security Regulations
DOE’s Centralized Storage Design Alternatives and Security Regulations
Slides - World Institute for Nuclear Security (WINS), Security of Dry Storage of Spent Nuclear Fuel, Vilnius, Lithuania, June 10-12, 2014
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
Topical Report on Actinide-Only Burnup Credit for PWR Spent Nuclear Fuel Packages
A methodology for performing and applying nuclear criticality safety calculations, for PWR spent nuclear fuel (SNF) packages with actinide-only burnup credit, is described. The changes in the U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, Pu-242, and Am-241 concentration with burnup are used in burnup credit criticality analyses. No credit for fission product neutron absorbers is taken. The methodology consists of five major steps. (1) Validate a computer code system to calculate isotopic concentrations of SNF created during burnup in the reactor core and subsequent decay.
Destructive Examination of 3-Cycle LWR Fuel Rods from Turkey Point Unit 3 for the CLIMAX-Spent Fuel Test
Destructive Examination of 3-Cycle LWR Fuel Rods from Turkey Point Unit 3 for the CLIMAX-Spent Fuel Test
The destructive examination results of five light water reactor rods from the Turkey Point Unit 3 reactor are presented. The examinations included fission gas collection and analyses, burnup and hydrogen analyses, and a metallographic evaluation of the fuel, cladding, oxide, and hydrides. The rods exhibited a low fission gas release with all other results appearing representative for pressurized water reactor fuel rods with similar burnups (28 GWd/MTU) and operating histories.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second National Report of Lithuania in Accordance with Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second National Report of Lithuania in Accordance with Article 32 of the Convention
Lithuania has signed this Convention on 30 September 1997 and ratified it on 18 December 2003. This Convention entered in force in Lithuania on 14 June 2004. This is the second report of Lithuania for this Convention. The aim of the report is to give the information on the fulfillment of obligations of this Convention to other Contracting Parties. This report will be discussed in the Third Review Meeting to be held in Vienna on 11-22 May 2009. This report was prepared according the Guidelines Regarding the Form and Structure of National Reports.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Third National Reort of Lithuania in accordance with Article 32 of the Convention
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Third National Reort of Lithuania in accordance with Article 32 of the Convention
Lithuania has signed this Convention on 30 September 1997 and ratified it on 18 December 2003. This Convention entered in force in Lithuania on 14 June 2004. This is the third report of Lithuania for this Convention. The aim of the report is to give the information on the fulfillment of obligations of this Convention to other Contracting Parties. This report will be discussed in the Third Review Meeting to be held in Vienna on 14-23 May 2012. This report was prepared according the Guidelines Regarding the Form and Structure of National Reports.