Category of Content
Siting Experience Documents Only
Publication Date
Country
Keywords
PWR Axial Burnup Profile Analysis
PWR Axial Burnup Profile Analysis
The purpose of this activity is to develop a representative “limiting” axial burnup profile for pressurized water reactors (PWRs), which would encompass the isotopic axial variations caused by different assembly irradiation histories, and produce conservative isotopics with respect to criticality. The effect that the low burnup regions near the ends of spent fuel have on system reactivity is termed the “end-effect”. This calculation will quantify the end-effects associated with Pressurized Water Reactor (PWR) fuel assemblies emplaced in a hypothetical 21 PWR waste package.
BWR Axial Profile
BWR Axial Profile
The purpose of this calculation is to develop axial profiles for estimating the axial variation in burnup of a boiling water reactor (BWR) assembly spent nuclear fuel (SNF) given the average burnup of an assembly. A discharged fuel assembly typically exhibits higher burnup in the center and lower burnup at the ends of the assembly. Criticality safety analyses taking credit for SNF burnup must account for axially varying burnup relative to calculations based on uniformly distributed assembly average burnup due to the under-burned tips.
Report on Implementation of the Obligations under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management–Second Review Meeting of the Contracting Parties
Report on Implementation of the Obligations under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management–Second Review Meeting of the Contracting Parties
The European Atomic Energy Community (“Euratom”) is a regional organisation, as referred to in Article 39(4) of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. It became a party to the Convention on 2 January 2006. This report is submitted in compliance with Articles 30 and 32 of the Convention for the Second Review Meeting of the Contracting Parties, to be held in Vienna from 15 to 26 May 2006.