Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Appendix E – Preliminary Railcar-to-Cradle Attachment Interface Gap Analysis
Appendix E – Preliminary Railcar-to-Cradle Attachment Interface Gap Analysis
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Initial Standardized Canister System Evaluation
Initial Standardized Canister System Evaluation
Design Basis Requirements Document (DBRD) for the DOE Atlas Railcar
Design Basis Requirements Document (DBRD) for the DOE Atlas Railcar
Appendix H – Preliminary Buffer Prototype Railcar Deliverables
Appendix H – Preliminary Buffer Prototype Railcar Deliverables
Appendix M – Atlas Railcar Dynamic Modeling Plan
Appendix M – Atlas Railcar Dynamic Modeling Plan
Appendix L – Atlas Railcar Cask and Cradle Dynamic Modeling Inputs (CALC-3015934)
Appendix L – Atlas Railcar Cask and Cradle Dynamic Modeling Inputs (CALC-3015934)
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
M3SF-19OR0204050160- Criticality Process, Modeling and Status for UNF-STDARDS
M3SF-19OR0204050160- Criticality Process, Modeling and Status for UNF-STDARDS
Design and Prototype Fabrication of Railcars for Transport of High-Level Radioactive Material; Phase 3 - Prototype Fabrication and Delivery
Design and Prototype Fabrication of Railcars for Transport of High-Level Radioactive Material; Phase 3 - Prototype Fabrication and Delivery
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
Appendix A – Design Changes Due to the Addition of the HI-STAR 190 Casks
Appendix A – Design Changes Due to the Addition of the HI-STAR 190 Casks
M4SF-19ID020303045- Atlas Railcar Phase 3 Final Report
M4SF-19ID020303045- Atlas Railcar Phase 3 Final Report
Appendix B – Revised Railcar-to-Cradle Attachment Interface
Appendix B – Revised Railcar-to-Cradle Attachment Interface
Appendix D – Revised Conceptual Cradle Design Family 4
Appendix D – Revised Conceptual Cradle Design Family 4
ATLAS Railcar Design Project Status Report
ATLAS Railcar Design Project Status Report
DOE Atlas Railcar Project End-of-Phase 2 Final Report
DOE Atlas Railcar Project End-of-Phase 2 Final Report
Atlas Phase 2 Final Report Appendix A
Atlas Phase 2 Final Report Appendix A
This document provides a white paper detailing required changes to the DOE Atlas railcar conceptual cradle attachment components and Phase 1 conceptual cradle design due to the addition of the HI-STAR 190 SL and XL casks to the project.
Atlas Phase 3 Report - Prototype Fabrication and Delivery
Atlas Phase 3 Report - Prototype Fabrication and Delivery
The United States Department of Energy (DOE) is preparing for future large-scale transport of spent
nuclear fuel and high-level radioactive waste, which are collectively defined as High-Level Radioactive
Material (HLRM) by the Association of American Railroads (AAR). A part of this preparation includes
designing railcars to be used for the transport of HLRM.
Atlas Phase 2 Report - Preliminary Design
Atlas Phase 2 Report - Preliminary Design
The United States Department of Energy (DOE) is preparing for future large-scale transport of spent nuclear fuel and high-level radioactive waste, which are collectively defined as High-Level Radioactive Material (HLRM) by the Association of American Railroads (AAR). A part of this preparation includes designing railcars to be used for the transport of HLRM.