Skip to main content

[Energy Solutions] Task Order 17- Spent Nuclear Fuel Transportation Cask Design Study

Author(s)
EnergySolutions
NAC International
Exelon
Talisman
Booz Allen Hamilton
Publication Date

Attachment(s)
Attachment Size
ES_TO17_Updated_Final_Report_1.pdf (7.14 MB) 7.14 MB
ES_TO17_Appendices-E-through-H_0.pdf (9.1 MB) 9.1 MB
Abstract

Per the requirements of the Task Order 17: Spent Nuclear Fuel Transportation Cask Design
Study, statement of work (SOW), EnergySolutions and its team partners: NAC International,
Talisman International, Booz Allen Hamilton and Exelon Nuclear Partners, hereafter referred to
as “the Team”, is providing a final report for U.S. Department of Energy (DOE) review, which
documents the cask concepts developed under this study and the results of supporting analysis
work.

The base cask concept is a 125-ton (maximum), single lid cask designed to accommodate an
overall fuel assembly heat generation level of up to 24 kW. Pressurized Water Reactor (PWR)
and Boiling Water Reactor (BWR) designs have two fuel basket capacities each, which are
32 bare PWR assemblies (32-PWR) or 28 PWR assemblies in Damaged Fuel Cans (DFCs)
(28-PWR), and 68 bare BWR assemblies (68-BWR) or 61 BWR (61-BWR) assemblies in DFCs,
respectively. All of the DFC designs have slightly lower capacity, since the DFCs are larger than
bare fuel assemblies and require lower-capacity baskets that have larger cell openings. The
PWR and BWR bare fuel designs are also able to accommodate combinations of 8 PWR
assemblies in DFCs and 24 bare PWR assemblies, and 8 BWR assemblies in DFCs and 60 bare
BWR assemblies, respectively. For high burn-up, shorter cooled spent nuclear fuel (SNF), the
numbers of fuel assemblies is more restricted. Assuming that there is no other fuel in the basket,
up to twelve (12) 62.5 GWd/MT PWR assemblies with out-of-reactor cooling time of 5 years can
be transported in either the 32-PWR or 28-PWR designs. The 68-BWR, depending on assembly
uranium loading and enrichment, can transport up to thirty-two (32) 62.5 GWd/MT BWR
assemblies with out-of-reactor cooling times of 5 years. The 61-BWR, again depending on
assembly uranium loading and enrichment, can transport up to twenty-nine (29) 62.5 GWd/MT
BWR assemblies with out-of-reactor cooling times of 5 years.

Community