<div class="page" title="Page 8">
<div class="layoutArea">
<div class="column">
<p><span style="font-size: 11.000000pt; font-family: 'Times'">In </span><span style="font-size: 13.000000pt; font-family: 'Times'">accordance </span><span style="font-size: 12.000000pt; font-family: 'Times'">with </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">requirements of 10 CFR 50.82, &quot;Termination of license,&quot; paragraph (a)(4)(i), this report constitutes the Dominion Energy Kewaunee, Inc. (DEK) Post-Shutdown Decommissioning Activities Report (PSDAR) for Kewaunee Power Station (KPS). This PSDAR contains </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">following: </span></p>
<p><span style="font-size: 12.000000pt; font-family: 'Times'">1. </span><span style="font-size: 11.000000pt; font-family: 'Times'">A </span><span style="font-size: 12.000000pt; font-family: 'Times'">description of </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">planned decommissioning activities along with a </span><span style="font-size: 13.000000pt; font-family: 'Times'">schedule </span><span style="font-size: 12.000000pt; font-family: 'Times'">for their accomplishment. </span></p>
<p><span style="font-size: 12.000000pt; font-family: 'Times'">2. </span><span style="font-size: 11.000000pt; font-family: 'Times'">A </span><span style="font-size: 12.000000pt; font-family: 'Times'">site-specific decommissioning </span><span style="font-size: 13.000000pt; font-family: 'Times'">cost </span><span style="font-size: 12.000000pt; font-family: 'Times'">analysis&#39; including </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">projected cost of managing </span><span style="font-size: 13.000000pt; font-family: 'Times'">spent </span><span style="font-size: 12.000000pt; font-family: 'Times'">fuel and site restoration. </span></p>
<p><span style="font-size: 11.000000pt; font-family: 'Times'">3. A </span><span style="font-size: 12.000000pt; font-family: 'Times'">discussion that provides </span><span style="font-size: 13.000000pt; font-family: 'Times'">the reasons </span><span style="font-size: 12.000000pt; font-family: 'Times'">for concluding </span><span style="font-size: 13.000000pt; font-family: 'Times'">that the </span><span style="font-size: 12.000000pt; font-family: 'Times'">environmental impacts </span><span style="font-size: 13.000000pt; font-family: 'Times'">associated </span><span style="font-size: 12.000000pt; font-family: 'Times'">with site-specific decommissioning activities </span><span style="font-size: 11.000000pt; font-family: 'Times'">will </span><span style="font-size: 12.000000pt; font-family: 'Times'">be bounded by </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">appropriately previously </span><span style="font-size: 13.000000pt; font-family: 'Times'">issued </span><span style="font-size: 12.000000pt; font-family: 'Times'">environmental impact </span><span style="font-size: 13.000000pt; font-family: 'Times'">statements. </span></p>
<p><span style="font-size: 12.000000pt; font-family: 'Times'">The PSDAR </span><span style="font-size: 13.000000pt; font-family: 'Times'">has been </span><span style="font-size: 12.000000pt; font-family: 'Times'">developed </span><span style="font-size: 13.000000pt; font-family: 'Times'">consistent </span><span style="font-size: 12.000000pt; font-family: 'Times'">with Regulatory Guide 1.185, </span><span style="font-size: 13.000000pt; font-family: 'Times'">&quot;Standard </span><span style="font-size: 12.000000pt; font-family: 'Times'">Format and Content for Post-Shutdown Decommissioning Activities Report&quot; (Reference </span><span style="font-size: 11.000000pt; font-family: 'Times'">1), </span><span style="font-size: 12.000000pt; font-family: 'Times'">and </span><span style="font-size: 13.000000pt; font-family: 'Times'">has </span><span style="font-size: 12.000000pt; font-family: 'Times'">taken into consideration the proposed revision </span><span style="font-size: 13.000000pt; font-family: 'Times'">thereof </span><span style="font-size: 11.000000pt; font-family: 'Times'">in </span><span style="font-size: 12.000000pt; font-family: 'Times'">Draft Regulatory Guide DG-1272. This report is </span><span style="font-size: 13.000000pt; font-family: 'Times'">based </span><span style="font-size: 12.000000pt; font-family: 'Times'">on currently available information and the plans </span><span style="font-size: 13.000000pt; font-family: 'Times'">discussed </span><span style="font-size: 12.000000pt; font-family: 'Times'">may be modified </span><span style="font-size: 13.000000pt; font-family: 'Times'">as </span><span style="font-size: 12.000000pt; font-family: 'Times'">additional information </span><span style="font-size: 13.000000pt; font-family: 'Times'">becomes </span><span style="font-size: 12.000000pt; font-family: 'Times'">available or conditions </span><span style="font-size: 13.000000pt; font-family: 'Times'">change. </span><span style="font-size: 12.000000pt; font-family: 'Times'">As required by 10 CFR 50.82(a)(7), DEK </span><span style="font-size: 11.000000pt; font-family: 'Times'">will </span><span style="font-size: 12.000000pt; font-family: 'Times'">notify </span><span style="font-size: 13.000000pt; font-family: 'Times'">the </span><span style="font-size: 12.000000pt; font-family: 'Times'">NRC </span><span style="font-size: 11.000000pt; font-family: 'Times'">in </span><span style="font-size: 12.000000pt; font-family: 'Times'">writing before performing any decommissioning activity inconsistent with, or making any significant </span><span style="font-size: 13.000000pt; font-family: 'Times'">schedule change </span><span style="font-size: 12.000000pt; font-family: 'Times'">from, </span><span style="font-size: 13.000000pt; font-family: 'Times'">those </span><span style="font-size: 12.000000pt; font-family: 'Times'">actions and </span><span style="font-size: 13.000000pt; font-family: 'Times'">schedules </span><span style="font-size: 12.000000pt; font-family: 'Times'">described </span><span style="font-size: 11.000000pt; font-family: 'Times'">in </span><span style="font-size: 12.000000pt; font-family: 'Times'">the PSDAR, including&nbsp;</span><span style="font-size: 13pt; font-family: Times;">changes </span><span style="font-size: 12pt; font-family: Times;">that significantly </span><span style="font-size: 13pt; font-family: Times;">increase the </span><span style="font-size: 12pt; font-family: Times;">decommissioning </span><span style="font-size: 13pt; font-family: Times;">cost.&nbsp;</span></p>
<p>This report also contains shutdown cost estimates for Kewaunee Power Station.</p>