Skip to main content

Long-Term Criticality Control Issues for the MPC (SCPB: N/A)

Author(s)
CRWMS
Publication Date

Attachment(s)
Attachment Size
BB0000000-01717-0200-00008_MOL.19960917.0032.pdf (906.72 KB) 906.72 KB
Abstract

This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) in response to a request received via a QAP-3-12 Design Input Data Request (Reference 5.1) from Waste Acceptance, Storage, & Transportation (WAST) Design (formerly MRSMPC Design). This design analysis is an answer to the Design Input Data Request to provide: Specific requirements for long-term criticality control. The time period for long-term criticality control requirements encompass the time phases of operations (pre-closure), containment (first 1,000 years post-closure), and isolation (the time period beyond the containment phase, at least to 10,000 years post-closure). The purpose and objective of this analysis is to provide specific long-term disposal criticality control requirements for the Multi-Purpose Canister (MPC) Subsystem Design Procurement Specification (DPS), so as to not preclude MPC compatibility with disposal in the MGDS.(References 5.2, 5.3, and 5.4) The response is stated in Section 8 herein and will be available for transmittal as an attachment to a QAP-3-12 Design Input Data Transmittal.

Category of Content
Associated Sites
Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.