ORDER GRANTING APPLICATIONS TO REDUCE RATES UNDER WHOLESALE POWER CONTRACTS
Attachment | Size |
---|---|
FERC Order - Yankee Decommissioning Costs.pdf (35.87 KB) | 35.87 KB |
FERC Docket ER13-1399-000 Dated 05.01.2013- Connecticut Yankee Decommissioning Cost Analysis.pdf (2.05 MB) | 2.05 MB |
FERC Docket ER13-1397-000 Dated 05.01.2013- Yankee Rowe Decommissioning Cost Analysis.pdf (3.34 MB) | 3.34 MB |
FERC Docket ER13-1395-000 Dated 05.01.2013 - Maine Yankee Decommissioning Cost Analysis.pdf (3.47 MB) | 3.47 MB |
<div class="page" title="Page 1">
<div class="layoutArea">
<div class="column">
<p><span style="font-size: 13.000000pt; font-family: 'TimesNewRomanPSMT'">On May 1, 2013, Maine Yankee Atomic Power Company (Maine Yankee), Yankee Atomic Electric Company (Yankee Atomic), and Connecticut Yankee Atomic Power Company (Conn Yankee) (collectively, Yankee Companies ), filed applications pursuant to section 205 of the Federal Power Act (FPA)</span><span style="font-size: 9.000000pt; font-family: 'TimesNewRomanPS'; font-weight: 700; vertical-align: 6.000000pt">1 </span><span style="font-size: 13.000000pt; font-family: 'TimesNewRomanPSMT'">to reduce rates in their wholesale power contracts. In this order, we grant the proposed rate reductions and changes to the terms of the wholesale power contracts to become effective on July 1, 2013. </span></p>
<p><span style="font-size: 13.000000pt; font-family: 'TimesNewRomanPSMT'">This order also documents shutdown site cost estimates for the Yankees.</span></p>
</div>
</div>
</div>
<p> </p>