Skip to main content

Validation Report: Total System Model Version 6.0 Report Generators

Author(s)
McLaughlin, D. L.
Blake, A. A.
Turner, S. L.
Publication Date

Attachment(s)
Attachment Size
50040-VAL-03-6.0-00.pdf (308.29 KB) 308.29 KB
Abstract

This validation report supports the issuance of Version 6.0 of the Total System Model (TSM, BSC 2007a) that is described in the TSM User Manual (UM, BSC 2007b) and the TSM Preprocessor (TSMPP) User Manual (BSC 2007c). This report assumes the reader has detailed, working knowledge of the TSM functions and the Civilian Radioactive Waste Management System (CRWMS) operations. This report is based on an earlier document, Validation Report: Total System Model Version 5.0 Report Generators (BSC 2007d) that supported TSM Version 5.0. The format of this document is identical to that of the Version 5.0 validation document. The content of this document has been updated to reflect changes made to report generators (RGs) for TSM Version 6.0. See the TSM UM for more information on the changes for TSM Version 6.0.
This validation was performed in accordance with AP-ENG-006, Total System Model (TSM)- Changes to Configuration Items and Base Case.

Additional Information
QA: N/A; 50040-VAL-03-6.0-00
Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.