Reactor Record Uncertainty Determination
The objective of this calculation is to evaluate commercial spent nuclear fuel (CSNF) bumup uncertainty based on pressurized water reactor (PWR) and boiling water reactor (BWR) records kept by each utility. The bumup uncertainties will be used to adjust either the waste package loading curves or the bumup values of assemblies shipped to the repository.
This engineering calculation supports the burnup credit methodology in Reference 1 and is performed in accordance with the AREVAIFANP procedures in References 2 and 3.