Skip to main content

Reactor Record Uncertainty Determination

Author(s)
Areva
Publication Date

Attachment(s)
Attachment Size
32-5041666-02_DOC.20040623.0002.pdf (3 MB) 3 MB
32-5041666-03_DOC.20050125.0013.pdf (256.5 KB) 256.5 KB
Abstract

The objective of this calculation is to evaluate commercial spent nuclear fuel (CSNF) bumup uncertainty based on pressurized water reactor (PWR) and boiling water reactor (BWR) records kept by each utility. The bumup uncertainties will be used to adjust either the waste package loading curves or the bumup values of assemblies shipped to the repository.
This engineering calculation supports the burnup credit methodology in Reference 1 and is performed in accordance with the AREVAIFANP procedures in References 2 and 3.

Category of Content
Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.