Skip to main content

Total System Model Version 6.0 Transportation Validation Report

The objectives of this report are to document the development of data and assumptions used in
developing the transportation modules of the Total System Model (TSM) and to demonstrate that
transportation and transportation timing work correctly. This validation supports the
Transportation Design and Basis Report (BSC 2007a) and is issued with Version 6.0 of the TSM.
This report is largely based on the analysis approach and content in the transportation calculation
provided for TSM Version 4.0 (BSC 2006a). Much of the information in that report is repeated

Validation Report: Total System Model Version 6.0 Report Generators

This validation report supports the issuance of Version 6.0 of the Total System Model (TSM, BSC 2007a) that is described in the TSM User Manual (UM, BSC 2007b) and the TSM Preprocessor (TSMPP) User Manual (BSC 2007c). This report assumes the reader has detailed, working knowledge of the TSM functions and the Civilian Radioactive Waste Management System (CRWMS) operations. This report is based on an earlier document, Validation Report: Total System Model Version 5.0 Report Generators (BSC 2007d) that supported TSM Version 5.0.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.