Disposal Concepts/Thermal Load Management (FY11/12 Summary Report)

This report is part of study to identify reference geologic disposal concepts for generic studies in the Used Fuel Disposition R&D Campaign. This report summarizes the work on both enclosed and open modes, which has been expanded to include thermal analysis of open modes, a range of spent nuclear fuel (SNF) burnup, additional disposal system description, and cost estimation.

Community

Program on Technology Innovation: Room at the Mountain

Projected expansion of nuclear power beyond the year 2014 will result in the need for commercial spent nuclear fuel (CSNF) management options in addition to the currently legislated CSNF storage capacity at the proposed Yucca Mountain geological repository. At present, 70,000 MTHM of storage capacity has been authorized, with a projection that 63,000 MTHM would be used for CSNF. This report extends preliminary analyses of the maximum physical capacity of the Yucca Mountain repository, presented in EPRI report 1013523.

Community

EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned

The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.

Community

Number of Waste Packages Hit By Igneous Events

The purpose of this report is to document calculations of the number of waste packages that could be damaged in a potential future igneous event intersecting a repository at YuccaMountain. The analyses include disruption from an igneous intrusion and from an igneous eruption. The analyses also support the evaluation of the potential consequences from a future event as part of the total system performance assessment (TSPA) for the license application for the Yucca Mountain Project.

Community

EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV—Lessons Learned

The effective termination of the Yucca Mountain program by the U.S. Administration in 2009
has further delayed the construction and operation of a permanent disposal facility for used fuel
and high level radioactive waste (HLW) in the United States. In concert with this decision, the
President directed the Energy Secretary to establish the Blue Ribbon Commission on America’s
Nuclear Future to review and provide recommendations on options for managing used fuel and

Community

YMP Preliminary Wet Handling Facility Throughput Study

This study describes the development of a preliminary throughput estimate for a Wet Handling Facility (WHF)/ used fuel repackaging factility. This study estimates the throughput for the WHF License Application design for a repository at Yucca Mountain as of September 2007. This design freeze allowed for the development of the throughput study without having to accommodate for minor updates to the facility design and documentation leading up to the License Application.