Waste Package Neutron Absorber, Thermal Shunt, and Fill Gas Selection Report

Materials for neutron absorber, thermal shunt, and fill gas for use in the waste package were selected using a qualitative approach. For each component, selection criteria were identified; candidate materials were selected; and candidates were evaluated against these criteria. The neutron absorber materials evaluated were essentially boron-containing stainless steels. Two candidates were evaluated for the thermal shunt material. The fill gas candidates were common gases such as helium, argon, nitrogen, carbon dioxide, and dry air.

Range of Neutronic Parameters Calculation File

The purpose of this engineering calculation is to document the benchmark range, over a variety of parameters, for the validation of the criticality calculations supporting the Monitored Geologic Repository (MGR). This engineering calculation accomplishes this by characterizing the Laboratory Critical Experiments (LCE) and the Pressurized Water Reactor (PWR) Commercial Reactor Criticals (CRC), and summarizing the significant parameters. This engineering calculation supports the Disposal Criticality Analysis Methodology program.

TEV Collision with an Emplaced 5-DHLW/DOE SNF Short Co-Disposal Waste Package

The objective of this calculation is to determine the structural response of the 5-DHLW/DOE (Defense High Level Waste/Department of Energy) SNF (Spent Nuclear Fuel) Short Co-disposal Waste Package (WP) when subjected (while in the horizontal orientation emplaced in the drift) to a collision by a loaded (with WP) Transport and Emplacement Vehicle (TEV) due to an over-run. The scope of this calculation is limited to reporting the calculation results in terms of maximum total stress intensities (Sis) in the outer corrosion barrier (dCB).

Direct Radiation Dose Consequence Calculation for Category 1 and 2 Event Sequences

Performance objectives for the geologic repository operations area through permanent closure in 10 CFR 63.111 identify compliance with regulatory dose limits for workers and members of the public as a design objective. The purpose of this design calculation is to determine direct radiation dose consequences for Category 1 and 2 event sequences. It does not include worker dose assessment for recovery operations following Category 1 event sequences.

WHF and RF Thermal Evaluation

The purpose of this analysis is to estimate the peak fuel assembly cladding temperature within the transportation casks that will be received in the WHF and RF, and to compare this value with established temperature limits. Thermally limiting scenarios are evaluated for both normal and off-normal operating conditions, with the off-normal condition defined as a loss of active ventilation. A second purpose of this analysis is to identify a specific room in the surface facilities as thermally limiting of all the rooms, with respect to the potentially highest temperatures on the concrete walls.

Radiation Effects of Isotopic Uncertainty for Burnup Credit Validation

The objective of this calculation is to provide the uncertainty term for fission product and minor actinides which contributes to the determination of the critical limit for burnup credit calculations. The scope of this calculation covers PWR and BWR spent nuclear fuel. This activity supports the Criticality Department's validation of burnup credit. The intended use of these results is in future Criticality Department calculations and analyses.

Attachment 2 - Annual Cost Profile (in Millions of 2007$), reply to Letter to Mr. Tim Frazier

The table is based on historical costs through 2006, which are shaded, and projected costs in the 2008 TSLCC. To convert to 2010$, multiply by 1.0586. The 2008 TSLCC assumes a single repository system capable of accepting and disposing of SNF and HLW equivalent to 122,100 Metric Tons of Heavy Metal (MTHM). This estimate includes all defense wastes currently destined for disposal at Yucca Mountain and projected discharges of SNF from commercial utilities, including the 47 nuclear power reactors that had received license extensions from the NRC as of January 2007.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.